Earth and rockfill dam for simulating piping dam break test
An earth-rock dam and simulated pipe technology, applied in hydraulic models and other directions, can solve the problems of difficult piping failure process, immature theory of cohesive soil and sediment migration, and inapplicability of non-cohesive sediment piping. Test success rates, avoid uncontrollable effects
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0022] according to figure 1 , figure 2 and image 3 As shown, the present invention includes a dam body 1 . The dam body 1 is mainly formed by stacking earth and rock materials on the dam foundation, the elevation of the top of the dam body 1 is 8m, and the water level above the dam is 7.6m.
[0023] In the test plan, the position where the piping channel appears is preset at a height of 1m relative to the dam foundation. Therefore, a weak layer 2 mainly composed of sand is laid at a position 1m high from the dam foundation in the dam body 1 (of course, other materials that are easy to be lost under the scouring action of water flow can also be used for laying), and the depth of the weak layer 2 is 0.6 m, the width is 1.5m, and the sand is fine sand with a fineness modulus of 2.2-1.6.
[0024] In the weak layer 2, a water pipe 3 with a diameter of 30 cm is buried, and the water pipe 3 runs through the dam body 1 along the upstream and downstream directions of the dam bod...
Embodiment 2
[0030] according to figure 1 , figure 2 and image 3 As shown, the present invention includes a dam body 1 . The dam body 1 is mainly formed by stacking earth and rock materials on the dam foundation, the elevation of the top of the dam body 1 is 8m, and the water level above the dam is 7.6m.
[0031] In the test plan, the position where the piping channel appears is preset at a height of 1m relative to the dam foundation. Therefore, a weak layer 2 mainly composed of sand is laid at a position 1m high from the dam foundation in the dam body 1 (of course, other materials that are easy to be lost under the action of water flow can also be used for laying), and the depth of the weak layer 2 is 0.6m , the width is 1.5m, and the sand is fine sand with a fineness modulus of 2.2-1.6.
[0032] In the weak layer 2, a water pipe 3 with a diameter of 20 cm is embedded, and the water pipe 3 runs through the dam body 1 along the upstream and downstream directions of the dam body 1.
...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com