Construction method of double shear wall formworks at deformation joint of high-rise building

A construction method and technology for high-rise buildings, applied to the processing of building materials, formwork/formwork/work frame, and on-site preparation of building components. It can solve problems such as damage and cracks, achieve quality control, save construction costs, The effect of improving work efficiency

Active Publication Date: 2015-05-20
CHINA RAILWAY NO 2 ENG GRP CO LTD +1
View PDF4 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0005] The purpose of the present invention is to overcome the above-mentioned deficiencies in the prior art, and to provide a construction method for double shear wall formwork at deformation joints of high-rise buildings. This method effectively saves construction costs and solves the problem of Problems causing cracks and breakage

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Construction method of double shear wall formworks at deformation joint of high-rise building
  • Construction method of double shear wall formworks at deformation joint of high-rise building
  • Construction method of double shear wall formworks at deformation joint of high-rise building

Examples

Experimental program
Comparison scheme
Effect test

Embodiment

[0041] A construction method for a double shear wall formwork at a deformation joint of a high-rise building, comprising the following steps:

[0042] step 1

[0043] First construct the shear wall on one side of the deformation joint, bind the steel skeleton for 1', carry out anti-leakage treatment on the sticky sponge strip at the bottom of the formwork, and set up multiple horizontally at the position of the shear wall to be poured at the bottom of the deformation joint to support the outer formwork the supporting steel bar 2', use the tower crane 6' to vertically place the outer formwork 3' on the supporting steel bar;

[0044] Step 2

[0045] After the outer formwork 3' is temporarily in place, the inner formwork 8' is hoisted to the working floor by a tower crane, so that the inner formwork 8' and the outer formwork 3' are relatively parallel to each other, and the steel skeleton 1' is located inside and outside. Between the formwork; then fix the outer formwork 3' and...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention relates to a construction method of double shear wall formworks at a deformation joint of a high-rise building, in particular to a construction method of double shear wall formworks at a deformation joint of a high-rise building. The construction method comprises the following steps: firstly constructing a shear wall at one side of the deformation joint; binding reinforcing steel bars; carrying out slurry leakage-proof treatment on a lower opening of the formwork; arranging an outside steel formwork of a wall body and an inside wooden formwork of the wall body; installing a wall penetrating screw, tightening the wall penetrating screw and rectifying the verticality of the wall penetrating screw; pouring concrete; removing the formworks; and finally constructing the shear wall at the other side of the deformation joint. With the adoption of the construction method provided by the invention, the phenomena of formwork shifting and slurry leaking cannot easily occur, the quality of pouring the concrete can be effectively controlled, the construction cost is effectively saved, and the problem that cracks and damage can be caused to a building in swinging is solved. With the adoption of the construction method provided by the invention, after the construction of the shear wall at one side of the deformation joint is completed, the outside steel formwork can be immediately hung to the shear wall to be constructed at the other side of the deformation joint by a tower crane, and the steel formworks are used in an alternating and circulating manner to form a line production operation, so that the working time is effectively shortened.

Description

technical field [0001] The invention relates to a construction method for high-rise buildings, in particular to a construction method for double-shear wall formwork at deformation joints of high-rise buildings. Background technique [0002] In order to prevent and avoid the occurrence of building cracks and damage, the building components are generally vertically disconnected in these sensitive parts, leaving a certain gap, and the building is divided into several independent parts to form rigid units that can deform freely without affecting each other. The reserved gaps that separate the disposal of the building are called deformation joints. In high-rise structures, the width of the deformation joint is generally 20-35cm, and the two sides of the deformation joint are shear walls. [0003] In recent years, with the rising housing prices, high-rise shear wall structure housing has developed rapidly. With the continuous expansion of the scale of the building, the shape of ...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Patents(China)
IPC IPC(8): E04G21/00E04G11/18
Inventor 周向东李世刚何开伟
Owner CHINA RAILWAY NO 2 ENG GRP CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products