Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

Assisted decision making method for load transfer in regional power grid

A technology of load transfer and regional power grid, applied in the direction of power network operating system integration, AC network voltage adjustment, information technology support system, etc., can solve problems such as inability to guarantee timeliness and uncertainty

Active Publication Date: 2015-01-21
CHINA ELECTRIC POWER RES INST +1
View PDF2 Cites 2 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

Load transfer is a common problem in regional power grid operation scheduling. When encountering equipment overload, equipment failure, power outage, equipment maintenance, in order to improve the reliability of power supply to users, dispatchers generally rely on dispatching experience or rough manual calculations , and then carry out load transfer and restore power supply to the lost load. Although the problem of restoring power supply to the lost load has been solved by experience, whether the transfer path is optimal, whether the transfer operation is simple, and whether the operation mode after the transfer is economical Safety is uncertain. Generally, relevant information or records need to be queried before operation, and timeliness cannot be guaranteed. Especially in emergency situations, dispatchers often urgently need accurate and concise result information

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Assisted decision making method for load transfer in regional power grid
  • Assisted decision making method for load transfer in regional power grid
  • Assisted decision making method for load transfer in regional power grid

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0064] Terms and definitions

[0065] Power point: the hot spare switch outside the power-loss zone.

[0066] Transfer path: the sequence of actions of the switch.

[0067] Transfer capacity: the line load rate of the power point.

[0068] Network components: switches, units, loads, capacitors or reactors, transformers, and circuits all become network components. Among them, transformers, lines and switches are called double-ended components, and transformers and lines are also called series branches; units, loads, capacitors or reactors, etc. are called single-ended components, also called parallel branches.

[0069] Node: It is the connection point of network elements, and the elements are connected to the grid through mutual common nodes.

[0070] Expert system definition: According to the historical operation experience of the power grid, define the expert system of load transfer strategy.

[0071] Load group definition: According to the daily operation experience of the power grid a...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention provides an assisted decision making method for load transfer in a regional power grid. The method comprises the following steps: (1) setting a target power-off device; (2) performing statistics on load information; (3) analyzing a load transfer strategy; and (4) evaluating economic safety. In the method, remote signalling, remote measuring and power grid topology information existing in a dispatching automation system are utilized fully to fastly and exactly generate a load transfer scheme capable of meeting the requirement of economic and safe operation of the power grid, thereby preventing the situations such as load shedding or long-time power off, out-of-limit overload and the like from happening during the load transfer scheme.

Description

Technical field [0001] The invention belongs to the field of electric power automation, and particularly relates to an auxiliary decision-making method for load transfer of a regional power grid. Background technique [0002] Regional power grids are generally closed-loop design, open-loop operation, connected through hot standby switches, and generally appear as radial in structure. Load transfer is a common problem in regional power grid operation and dispatch. When equipment is overloaded, equipment failure, power failure, equipment overhaul, in order to improve the reliability of power supply to users, dispatchers generally rely on dispatching experience or rough manual calculations , And then carry out load transfer and restore power supply to the lost load. Although the problem of power recovery for the lost load is solved by experience, whether the transfer path is optimal, whether the transfer operation is simple, and whether the operation mode after the transfer is econo...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): H02J3/14
CPCY02B70/3225Y04S20/222
Inventor 赵昆贾育培郎燕生杨清波
Owner CHINA ELECTRIC POWER RES INST
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products