A system device, measurement and control system technology, applied in the direction of test/calibration device, measurement device, speed/acceleration/shock measurement equipment test/calibration, etc., to achieve the effect of increasing multi-functionality, facilitating function expansion, and meeting the needs of precise measurement and control
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0038] A new wave / tide test and verification system includes two parts: the core measurement and control system and the key auxiliary mechanism. The core measurement and control system is composed of a power system and a measurement and control system. The power system includes a permanent magnet synchronous traction machine 5, a traction machine frame 6, a traction machine shock absorber 7, and a double-wound traction wheel composed of semicircular notched traction wheels. Structure Traction wheel set 8, wire rope set 9, counterweight side guide rail 12 and bearing platform side guide rail 17, permanent magnet synchronous traction machine 5 is fixed on the traction base 6, and the shock absorbing device 7 of the traction machine is connected to the bearing Wall connection, the rewinding structure traction sheave group 8 composed of semicircular notched traction sheaves is located obliquely below the permanent magnet synchronous traction machine 5, China Elevator, Volume 17, Is...
Embodiment 2
[0041] Such as Figure 4 , the test verification of the wave buoy:
[0042] 1. The test and verification personnel first check the appearance of the wave buoy submitted for inspection, and conduct a preliminary power-on test to see if it is working normally.
[0043] 2. The test and verification personnel enter the PC 1 monitoring system, set the communication parameters, and enter the wave buoy test and verification subsystem to input the basic information and technical parameters of the buoy to be inspected.
[0044] 3. The testing and verification personnel initialize the system, that is, lower the lifting and lowering platform 19 to the lowest floor, and cover the wide-mouth water storage tank 13 with the sliding baffle 23 .
[0045] 4. With the assistance of two or more persons, the inspection buoy is installed on the water lifting platform 19 by sliding the guide rail 25 on the baffle plate 23, and the power supply and the communication port are connected.
[0046] 5. ...
Embodiment 3
[0053] Such as Figure 5 , the test verification of the underwater tide gauge:
[0054] 1. The testing and verification personnel first check the appearance of the pressure tide gauge sent for inspection, and conduct a preliminary power-on test to see if it is working normally.
[0055] 2. The test and verification personnel enter the PC 1 monitoring system, set the communication parameters, enter the tide gauge test and verification subsystem to input the basic information and technical parameters of the pressure tide gauge to be inspected.
[0056] 3. The testing and verification personnel set the parameters of the testing and verification system, raise the lifting platform 19 to 15m, and cover the wide-mouth water storage tank 13 with a sliding baffle 23 .
[0057] 4. According to the number of pressure tide gauges tested and verified at the same time, the testing and verification personnel select different traveling poles 21 with accompanying cables, and install the press...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com