Mountain stream river-crossing cable-stayed chain trestle and hoisting method thereof
A hoisting method and trestle technology, applied to bridges, truss bridges, bridge forms, etc., can solve the time-consuming, labor-intensive and labor-intensive problems of component fabrication and assembly, and achieve the effects of saving manpower and shortening the construction period
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0059] See Example 1 Figure 13 As shown, this embodiment is a node construction operation platform where the profiled steel beam and the profiled steel column flange are connected, wherein the support plate 18.2 is an angle steel, the platform joist 18.3 is a channel steel, the steel pipe 18.6 is a bent steel pipe, and the cover plate joist 18.9 is The angle steel is welded with the platform joist 18.3, in which the support plate 2, that is, the upper flange of the angle steel and the upper flange of the profiled steel beam, are kept at the same height, and are welded on both sides of the profiled steel beam in two sections.
Embodiment 2
[0060] See Example 2 Figure 14 As shown in the figure, this embodiment is a node construction work platform where the profiled steel beam and the profiled steel column web are connected, wherein the support plate 18.2 is a steel plate, which can be replaced by the upper flange of the profiled steel beam in this embodiment, and the platform joist 18.3 is a groove Steel, the steel pipe of the steel pipe frame 18.6 is a one-inch pipe, and the cover plate joist 18.9 is welded with the angle steel and the platform joist 18.3.
[0061] Assemble the steel pipe frame at the construction site and lift it to the node with a crane; open the folding cover 18.7 during assembly, fix it with the hemp rope and the railing of the steel pipe frame, and the construction personnel will ascend from the reserved ladder to the platform; after the working platform is in place , the construction personnel fasten and fix the screw 18.4, and put down the folding cover 18.7; if the work platform needs t...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com