Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

Commissioning method of bypass-free wet desulphurization system of coal-fired unit by means of tiny-oil ignition

A technology of wet desulfurization and coal-fired units, applied in control systems, separation methods, chemical instruments and methods, etc., can solve problems such as plate deformation, secondary pollution, and plate condensation

Active Publication Date: 2012-08-01
ELECTRIC POWER RES INST OF STATE GRID ZHEJIANG ELECTRIC POWER COMAPNY +1
View PDF5 Cites 15 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

The defect of this debugging method is that: the electrostatic precipitator electric field is put into operation too early, resulting in dew condensation and low-temperature corrosion on the plate, which reduces the flashover voltage; Particles pollute the electrode plate of the electrostatic precipitator, which not only affects the dust removal efficiency, but also causes the ash hopper to bridge, unburned coal powder and oil stains in the precipitator for secondary combustion, resulting in deformation of the electrode plate, which seriously affects the safe operation of the precipitator; continuous slurry Replacement, that is, a large waste of water resources, also increases the treatment pressure of the desulfurization wastewater system, and will cause secondary pollution when it is too late to treat

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Commissioning method of bypass-free wet desulphurization system of coal-fired unit by means of tiny-oil ignition
  • Commissioning method of bypass-free wet desulphurization system of coal-fired unit by means of tiny-oil ignition

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0033] The commissioning of the non-bypass wet desulfurization system of coal-fired units is divided into two stages: cold state commissioning and hot state commissioning. In the cold state commissioning stage, it is mainly to pay attention that the desulfurization process water system and the desulfurization wastewater treatment system need to be commissioned in advance. The desulfurization wastewater treatment system is used to receive and treat the waste water generated by the desulfurization system. Because in the hot state commissioning, the system will discharge waste water during the startup stage of the unit. The debugging of other systems is the same as that of the monomer and sub-systems with bypass system.

[0034] A. Cold debugging method and sequence

[0035] The main tasks of the cold state commissioning stage are the individual commissioning of each equipment and the trial operation of the subsystems. It is worth noting that since there is no bypass flue, the d...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a commissioning method of a bypass-free wet desulphurization system of a large coal-fired unit by means of tiny-oil ignition. A unified formed commissioning method of a hot commissioning specific to bypass-free desulphurization systems does not exist at present. The commissioning method comprises two stages of a cold commissioning and the hot commissioning, the commissioning of a desulphurization process water system and a desulphurization waste water treatment system is required to be completed before the hot commissioning is started, the desulphurization waste water treatment system is used for receiving and processing waste water produced by a desulphurization system, commissioning steps and methods of the rest branch systems are identical to those of corresponding branch systems of a wet desulphurization system with a bypass, and start operation steps in the stage of the hot commissioning are properly adjusted. According to the commissioning method of the bypass-free wet desulphurization system of the coal-fired unit by means of tiny-oil ignition, the cold and hot commissioning processes are adjusted so that the problems existing in a bypass-free system during the hot commissioning are avoided, and the construction period is further reasonably arranged so that the synchronous safe starting of the desulphurization system and a main generator unit is guaranteed.

Description

technical field [0001] The invention belongs to the field of desulfurization flue gas purification, and specifically relates to a debugging method for a large-scale coal-fired unit without a bypass wet desulfurization system using a micro-oil ignition method, especially a method for debugging and starting a wet desulfurization system without a bypass in a thermal state . Background technique [0002] Driven by the national environmental protection policy, the flue gas wet desulfurization system has been widely used in thermal power units in my country. In the traditional desulfurization technology with bypass, when the unit is in the state of start-stop and accident maintenance, the flue gas can be discharged into the chimney through the bypass flue, which can avoid the dust and unburned oil particles of the main generator set at the start-up stage Entering the desulfurization system, it can run without stopping when the desulfurization system is overhauled. The main probl...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): F22B35/00B01D53/50B01D53/80
Inventor 陈彪金东春陆建伟李辉乐园园周晓云毛文利曹志勇李志国
Owner ELECTRIC POWER RES INST OF STATE GRID ZHEJIANG ELECTRIC POWER COMAPNY
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products