Ecological dispatching method of river channel type water reservoir suitable for home fish breeding
A scheduling method and river channel technology, applied in fish farming, river regulation, application, etc., can solve the problems of lack of quantitative analysis, in-depth research on river ecological flow, etc., and achieve the effect of reducing impact and coordinating interest relations
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0028] This embodiment proposes an ecological regulation method for river-type reservoirs suitable for the breeding needs of domestic fish. The schematic diagram of the ecological regulation of the reservoir is as follows figure 2 As shown, the specific steps are:
[0029] (1) During the early spawning period of the four major Chinese carps in April, reduce the discharge flow of the dam within 2-3 days and raise the design water level of the reservoir, but not exceed the upper limit water level. For example, the average daily discharge flow will drop from 10,000 cubic meters per second to 8,000 cubic meters per second , to provide flow space for continuously increasing the discharge flow in the future and ensuring the daily increase;
[0030] (2) Increase the discharge flow of the Three Gorges Dam, continue to discharge water for 5-7 days, and increase the daily average daily outflow flow by about 1000-3000 cubic meters per second, for example, increase the daily average disc...
Embodiment 2
[0034] This embodiment proposes an ecological regulation method for river-type reservoirs suitable for the breeding needs of domestic fish. The schematic diagram of the ecological regulation of the reservoir is as follows image 3 As shown, the specific steps are:
[0035] (1) At the beginning of the spawning of the four major domestic fishes in April, continue to reduce the discharge flow of the dam for 15-20 days. For example, the average daily discharge flow drops from 5,000 cubic meters per second to 4,000 cubic meters per second, and the design water level of the reservoir is raised, but not exceeding the upper limit. In order to continuously increase the discharge flow in the future and ensure the daily increase, it provides flow space. In order to suppress the occurrence of algal blooms in spring, a peak-shaving discharge is adopted during the period to increase water level fluctuations and improve the hydrodynamic conditions of the reservoir area;
[0036] (2) Increase...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com