Method and device for scheduling resource
A resource scheduling and user equipment technology, applied in the communication field, can solve problems affecting scheduling performance and large delay
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0021] The embodiment of the present invention determines whether the user equipment (UE) is located in the central area or the edge area, and if it is in the central area, resources are allocated independently for it; if it is in the edge area, a paired UE is selected for it, and resources are independently allocated for the paired UE. Since the UE in the central area does not participate in the comparison when selecting the paired UE, the number of calculations is reduced, and the scheduling performance is improved while implementing resource scheduling through space division multiplexing. Generally, it can ensure that the delay of the scheduling algorithm is limited to the user range of state changes.
[0022] see figure 1 , the main method flow of resource scheduling in this embodiment is as follows:
[0023] Step 101: Determine whether the user equipment is located in the central area or the edge area.
[0024] Step 102: When there is a user equipment located in the bor...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com