Gas drainage method and equipment with alternative drainage
A gas extraction and extraction technology, which is applied in the field of total gas extraction, can solve the problems of inability to increase gas extraction volume, decrease gas permeability, and inability to accelerate desorption of gas, and achieves wide practicability, low cost, and convenient operation. Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0020] An embodiment of the present invention will be further described below in conjunction with accompanying drawing:
[0021] In the gas drainage method with alternating pressure and pressure extraction of the present invention, after the construction of the gas drainage borehole 1 is completed, the coal body within a certain range around it will be deformed due to the pressure relief, and a large number of cracks 4 will be generated at the same time, which will be used for gas desorption and flow. Conditions are provided. First, connect the bypass pipeline 9 in parallel with the front and rear three-way ball valves 10 and 7 on the main drainage pipeline 6 before and after the underground gas pump 8 in the coal mine, and connect the high-pressure reservoir to the main drainage pipeline 6 in front of the front three-way ball valve 10. Gas tank 13, the front of the high-pressure gas storage tank 13 is connected to the outlet control ball valve 15, the rear of the high-pressur...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com