Technology method of reinforced grouting in high-pressure water-rich solution cavity of tunnel

A process method and grouting technology, applied in tunnels, tunnel lining, earthwork drilling, etc., can solve the problems of poor media bonding ability, poor deformation resistance, formation instability, etc., and achieve control of excavation deformation and structural deformation. The effect of reducing and suppressing the deformation of the vault

Active Publication Date: 2011-12-14
CHINA RAILWAY TUNNEL GROUP CO LTD
View PDF5 Cites 22 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

However, due to the small fineness of the medium, the grout is used to reinforce the solution cavity filling by means of splitting, filling and compacting. Although it can achieve the effect of sealing karst outflow and strengthening and improving the formation, the medium itself has poor cementation ability, and the tunnel is During the excavation of the dissolved cavity, the anti-deformation ability of the grouting reinforced body is poor, and it is easy to cause stratum instability due to excessive deformation, causing sudden mud gushing

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Technology method of reinforced grouting in high-pressure water-rich solution cavity of tunnel
  • Technology method of reinforced grouting in high-pressure water-rich solution cavity of tunnel
  • Technology method of reinforced grouting in high-pressure water-rich solution cavity of tunnel

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0030] The present invention is described with reference to the accompanying drawings and embodiments, and the given embodiments do not constitute any limitation to the present invention.

[0031] Such as figure 1 As shown, a tunnel high-pressure water-rich solution cavity reinforced grouting process, the specific process is:

[0032] For the area to be reinforced in front of the tunnel excavation face, advance segmental grouting is adopted to carry out drilling and grouting reinforcement;

[0033] Progressive segmental grouting belongs to the advanced full-section grouting reinforcement technology. The advanced full-section grouting reinforcement process is currently a commonly used grouting reinforcement method for tunnel and underground engineering construction. Before, the whole section of the pre-excavated soil was reinforced and improved by grouting construction.

[0034] In advanced full-section grouting and grouting reinforcement, progressive segmental grouting is a ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention relates to the technical fields of tunnel and underground engineering, providing a process method for reinforcing and grouting of a high-pressure water-rich solution cavity of a tunnel. The process method comprises the following steps of: carrying out drilling, grouting and reinforcing within a range required to be reinforced in front of a tunnel work face by adopting an advanced segmented grouting mode; after the grouting is ended, carrying out drilling and flushing on a anchor rod hole at the original grouting hole site by using a geological drilling rig; and feeding a glass fiber anchor rod into the anchor rod hole and carrying out grouting construction. According to the process method disclosed by the invention, the glass fiber anchor rod is additionally arranged in a grouting solidified body to form a space meshy structure body with soil (sand) body, thus the action of the glass fiber anchor rod for resisting shearing, cutting and tensioning in the system is fully exerted. In addition, according to the process method disclosed by the invention, the deformability of digging a hole body is effectively controlled while water from karst can be blocked and the soft ground stratum is reinforced; and the capability of resisting high water pressure can be born and the construction requirement for quick digging and coupling of the karst hole body is met.

Description

technical field [0001] The invention relates to the technical field of tunnels and underground engineering, and mainly relates to a high-pressure water-rich dissolved cavity reinforced grouting process for tunnels. Background technique [0002] During tunnel excavation in karst areas, high-pressure water-rich filling karst is often encountered. Due to the complex development characteristics of karst, the filling medium is mostly clay, sand and other fine media with loose structure and poor self-stabilization ability. Due to the special nature of karst geology, in the process of high-pressure water-rich karst treatment, high-level discharge branch tunnels are mostly used to implement water release and pressure reduction to avoid the construction risk of high-pressure water-rich karst, but not all karsts can achieve potential energy pressure reduction. If the full-section curtain grouting technology is used to reinforce and improve the soil (sand) body in the high-pressure wat...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): E21D11/10E21D20/00E21D11/38
Inventor 孙国庆高广义张民庆谢敏李昌牟松徐启鹏白中坤
Owner CHINA RAILWAY TUNNEL GROUP CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products