Periodic scheduling timetable construction method applied to time-triggered switched network
A switched network and time-triggered technology, applied in the field of periodic scheduling schedule construction, can solve problems such as difficulty in generating scheduling schedule maintenance for switched networks, etc.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0020] The present invention will be further described in detail below in conjunction with the accompanying drawings.
[0021] In the present invention, the data frame flow periodically transmitted by the time-triggered mechanism is called time-triggered flow (denoted as TT flow), the data frame transmitted in TT flow is called TT frame, and the network communication task corresponding to TT flow is called TT task , that is, the time-triggered periodic task. The period of the TT task is called the TT task period. The present invention also allows RC traffic and BE traffic with low priority to be compatible with TT traffic time-sharing sharing physical link in the same network under the premise of time slot reservation and priority limitation.
[0022] The application environment of the present invention is a time-triggered switching network with a time synchronization mechanism, especially including a TTE (Time-Triggered Ethernet, Time-Triggered Ethernet) network of TTTech Co...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com