Pressure steel pipe overhaul access passage structure of high-water head hydropower station and construction method thereof
A technology of penstock and construction method, applied in the direction of hydropower station, water conservancy project, hydropower generation, etc., can solve the problems of delayed construction period, long hole line, single function of maintenance and entry hole, etc., so as to facilitate daily management and maintenance, shorten the The effect of reducing the construction period and reducing the amount of excavation works
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0027] Such as Figure 4-6 As shown, the present embodiment has only one construction branch tunnel 1 that increases the construction face as the excavated long tunnel during the construction period, and one end of the construction branch tunnel is connected with two parallel pressure steel pipes (pressure steel pipes 1, 7 and pressure steel pipes) as the tunnel main tunnel. II 8) Arranged vertically and intersecting, each penstock is connected with an inclined well 6 (one upward, the other downward). The construction branch hole 1 is arranged in a T-shape with the end pressure steel pipe (the pressure steel pipe I 7), and the construction branch hole 1 is arranged in a cross shape with another pressure steel pipe (the pressure pipe II 8). In this example, the penstock 17 is a buried pipe, and the plugging body 3 is poured at the end of the construction branch hole 1 at the junction of the penstock 1, and the maintenance access channel 4 is pre-buried in the plugging body, and...
Embodiment 2
[0033] Such as Figure 7-9 As shown, the basic structure of this example is the same as Example 1, the difference is that the two penstocks are open pipes, the steel is 600MPa or 800MPa grade steel, and the thickness of the pipe wall is 30-50mm. (Under high internal water pressure, it is necessary to increase the thickness of the pipe wall, and it can also be upgraded to a steel plate with higher strength).
[0034] The construction method in this example includes steps:
[0035] 1. The construction branch tunnel 1 passes through two penstocks vertically, which are the penstock I 7 at the end of the construction branch tunnel and the penstock II 8 in the middle of the construction branch tunnel. Both penstocks are designed as open pipes. When the penstock After the I installation is completed (junction tunnel section with the construction branch tunnel), the maintenance access passage 4 is directly established on the penstock I 7, and the access door 5 is established on the o...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com