Treatment method for slowing gully erosion
A gully and ditch head technology, applied in the field of reducing buffer ditch erosion, can solve the problems of high cost and poor treatment effect, and achieve the effect of reducing buffer ditch erosion, reasonable and ingenious design, and strong comprehensiveness.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0019] A treatment method for mitigating ditch erosion. The method is composed of four parts: gully selection, ditch head treatment, ditch bottom treatment and ditch head wall treatment. The specific steps are as follows:
[0020] 1. Selection of gully, the slope of the left gully wall of the selected gully is 45° and the height of the gully head wall is 5 meters;
[0021] 2. Ditch head treatment, planting jatropha and mulberry plants above the ditch head to form a buffering hedgerow belt above the head of the ditch, the buffering hedgerow belt above the ditch head is in an inverted U shape, and the width of the buffering hedgerow belt is 2 meters, the U-shaped mouth of the inverted U shape is opposite to the head of the groove, the width of the U-shaped mouth of the inverted U shape is 1.5 meters wider than the width of the head of the groove, and the top of the curve of the inverted U shape is separated from the head of the groove The vertical distance is 5 meters, and 5 5-year-o...
Embodiment 2
[0025] Embodiment 2 and Embodiment 3 are the same as Embodiment 1, except for the following measures.
[0026] Example 2
[0027] 1. The choice of gully, the slope of the left and right gully walls of the gully is 30° and the height of the gully head wall is 4 meters;
[0028] 2. Ditch head management, the width of the buffering plant fence above the inverted U-shaped ditch head is 1.5 meters, and the width of the inverted U-shaped U-shaped opening is 1 meter wider than the width of the ditch head. The vertical distance between the top of the curve and the head of the ditch is 4 meters, and the hedgerow is buffered above the head of the ditch of 4 wooden piles are embedded in the inverted U-shaped curved section;
[0029] 3. Ditch bottom treatment, the U-shaped bottom of the ditch buffering hedgerow belt has a vertical distance of 4 meters from the bottom of the U-shaped curve and the head of the ditch, and the width of the bottom buffering hedgerow belt is 4 meters;
[0030] 4. Trea...
Embodiment 3
[0032] 1. The choice of gully, the slope of the right gully wall of the gully is 25° and the height of the head wall is 2 meters;
[0033] 2. Ditch head management, the width of the buffer plant fence above the inverted U-shaped ditch head is 1 meter, the width of the inverted U-shaped U-shaped mouth is equal to the width of the ditch head, and the inverted U-shaped curve The vertical distance between the top and the head of the ditch is 3 meters, and the hedgerow is buffered above the head of the ditch of 3 wooden piles are embedded in the inverted U-shaped curved section;
[0034] 3. Ditch bottom management, the U-shaped bottom of the ditch buffer plant hedgerow belt has a vertical distance of 3 meters from the bottom of the U-shaped curve and the head of the ditch, and the width of the ditch bottom buffer plant hedgerow belt is 2 meters;
[0035] 4. Ditch head wall treatment, plant pomegranate on the land between the ditch head and the ditch bottom buffering plant fence, and bur...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com