Just-in-time-based parallel forward calculation programing method for steel-making production planned time
A production planning, just-in-time technology, used in computing, instrumentation, data processing applications, etc.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0097] On the basis of establishing the underlying object model of the production process network, and based on the just-in-time steelmaking production operation planning time parallel and forward programming method, the steelmaking-continuous casting production operation plan for N furnaces passing through the corresponding stations in M processes is compiled. The inventive method is described in detail as follows:
[0098] Step 1 Initialize
[0099] Read the underlying object model of the production process network, batch planning, and the scheduled start-up time of each continuous casting machine;
[0100] Step 2 Continuous pouring calculates the start pouring time of each heat x i,M,k
[0101] According to the starting and pouring time of each continuous casting machine, the continuous casting calculation of formula (1) is used to obtain the start and end pouring time of each heat on the continuous casting;
[0102] Step 3: Calculate the target start time x' of each h...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com