Panel construction method of concrete faced rock-fill dam
A technology of concrete slab and construction method, which is applied in the direction of filling, dams, barrages, etc., can solve the problems of shortened pouring time intervals and quality problems, and achieve the effects of reducing uneven settlement, preventing structural cracks, and avoiding voids
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0022] The present invention will be further described below with the specific construction method of the main dam of the Gongboxia Hydropower Station on the Yellow River as an example.
[0023] The Gongboxia Hydropower Station of the Yellow River is located on the main stream of the Yellow River at the junction of Xunhua County and Hualong County in Qinghai Province. The upstream is 76km away from Lijiaxia Hydropower Station, the downstream is 148km away from Liujiaxia Hydropower Station, and 153km away from Xining City. The traffic conditions are convenient.
[0024] This project is a first-class large (I) project mainly for power generation, and also for irrigation and water supply. The total storage capacity of the reservoir is 620 million m 3 , the adjustment storage capacity is 75 million m 3 , for daily regulation of the reservoir. The installed capacity of the power station is 1500MW (five units with a capacity of 300MW), the guaranteed output is 492MW, and the avera...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com