Multiprocessor task scheduling management method based on data flow model
A multi-processor and task scheduling technology, applied in the direction of multi-program device, inter-program communication, etc., can solve the problem of complex task scheduling management design of multi-processor
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0031] The multiprocessor task scheduling management method in the present invention is realized by dividing it into three modules in the system software design. These three modules are a core module 201 , a node control module 202 and a driver module 203 . Through their coordination, the application tasks in the system can be converted into program nodes and corresponding ports suitable for multiprocessor scheduling. Nodes and ports have the following characteristics:
[0032] Each node corresponds to a task program, and the scheduling of nodes is equivalent to the scheduling of tasks.
[0033] A node contains one or more ports, and the connection relationship between ports reflects the data flow dependency between nodes in the data flow model.
[0034] The ports of each node are divided into two types: input ports and output ports. Such as image 3 shown. Each node 301 includes a data input port 302 and a data output port 303 .
[0035] Each port has a correspond...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com