Novel stiffening structure of super-large box-shaped compression member of steel bridge and construction method thereof

A construction method and pressure bar technology, applied in bridge parts, bridges, bridge construction and other directions, can solve the problems of not meeting the stress requirements of the large vertical bars of the Dongjiang Bridge, the compression stability reduction coefficient is small, and the secondary stress of nodes increases. , to achieve the effect of adding bridge landscape effect, improving operation efficiency and improving bearing capacity

Active Publication Date: 2010-04-07
ZHONGTIE MAJOR BRIDGE RECONNAISSANCE & DESIGN INST
View PDF0 Cites 1 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

Due to the limitation of the uniform width, for long compression bars such as the large vertical bars of the Dongjiang Bridge, the compression stability reduction coefficient in the conventional width direction is small, which cannot meet the force requirements of the large vertical bars of the Dongjiang Bridge
If the width of the member is increased, the width of other associated main truss members will increase, which will increase the project cost; if the size of the member in the height direction is increased, the difference in the height and width directions of the member will be large, which is different from The gusset plates connected to each other have a large size and the secondary stress of the joints increases, which is unfavorable to the force

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Novel stiffening structure of super-large box-shaped compression member of steel bridge and construction method thereof
  • Novel stiffening structure of super-large box-shaped compression member of steel bridge and construction method thereof
  • Novel stiffening structure of super-large box-shaped compression member of steel bridge and construction method thereof

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0025] refer to Figure 1 to Figure 4 , the new stiffening structure of the steel bridge box-shaped extra-large pressure member is to add a stiffener 1 outside the box-shaped section 3 of the large member, and the stiffener is outsourced with a landscape decoration structure 2.

[0026] refer to Figure 5 , the extra-large pressure member 4 of the present invention is applied on the Guangdong Dongjiang double-layer highway bridge 5, and the bridge has been successfully closed at present, and will be opened for operation within the year.

[0027] Concrete construction steps of the present invention are as follows:

[0028] 1) Segmentation of new super-large pressure rods: Divide new super-large pressure rods into segments according to possible lifting equipment and transportation capacity.

[0029] 2) Segment production:

[0030] ① Plate unit production: After the steel plate passes the re-inspection of the factory, the pretreated steel plate is blanked and edge processed acc...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention relates to a novel stiffening structure of super-large box-shaped compression member of a steel bridge and a construction method thereof, a stiffening rib is additionally arranged outside the box-shaped section of a large member, and landscape structure design is adopted to the appearance of the stiffening rib. When in construction, the compression member is divided into sections, manufactured in steps and installed as follows: manufacturing a plate unit, assembling the box-shaped member by taking the plate unit as the reference, manufacturing the bolt row hole, performing trial assembly and anticorrosive coating on all sections of the member on a preset trial assembly platform, assembling all sections of the member in place according to the assembly sequence at a construction site. In the invention, a stiffening rib additionally arranged to improve the bearing capacity of the member; the assembly area is obviously increased; the row number of splice bolts and the use of splice bars are reduced; the construction is simple and the operation efficiency is high. The landscape decorative structure is adopted to the external stiffening rib, and the design of a large vertical bar is enriched, thereby satisfying the stress demand and beautifying the bridge landscape. The stiffening structure is successfully applied to the Dongjiang double-deck highway project in Guangdong, and the bridge is successfully closed to be opened into operation.

Description

technical field [0001] The invention relates to an innovative design and construction method for a box-shaped extra-large pressure bar of a steel bridge. Background technique [0002] Guangdong Dongjiang Bridge is the first super-large double-layer highway bridge in China, with a main span of 208 meters. The bridge adopts a rigid suspension cable-stiffened steel truss structure, and a total of 14 road lanes are arranged. Concrete bridge deck structure supported by longitudinal and transverse beams. Therefore, this bridge dead load, live load are huge, especially big vertical bar 3 (seeing Figure 5 ) is subjected to excessive pressure, and the conventional box-shaped compression rod is difficult to meet the requirements of the bearing capacity of the rod. [0003] The conventional vertical bars of the existing steel truss girder bridge adopt a box-shaped section, and the width of the main truss members is uniform. Due to the limitation of uniform width, for long compressio...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): E01D19/00E01D21/00
Inventor 徐恭义沈泽向彭振华李华云付战工庄勇
Owner ZHONGTIE MAJOR BRIDGE RECONNAISSANCE & DESIGN INST
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products