Deceleration and antiskid marked line suitable for entrance and exit sections of tunnel
A technology of deceleration marking, import and export, applied in tunnels, mining equipment, earth-moving drilling, etc., to achieve the effect of good environmental protection, prevention and control of road traffic accidents, and excellent performance
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0031] like figure 1 , figure 2 , image 3 , Figure 4 and Figure 5 As shown, the present invention includes a continuous longitudinal anti-skid marking line 2 respectively arranged at the tunnel entrance 1 and tunnel exit 7 along the driving direction, and a plurality of laterally spaced deceleration marking lines arranged along the driving direction at the outer section of the tunnel entrance hole. 3 and multiple laterally spaced deceleration markings 3 arranged in the road section of the tunnel exit hole along the driving direction. The length of the anti-skid marking line 2 is 30-50m and it extends from outside the hole to the inside of the hole. The distance between the anti-skid marking line 2 and the adjacent deceleration marking line 3 is 4-15m. The length of the road section where the speed reduction line 3 is laid on the road section in the tunnel exit hole is 40-250m.
[0032] combine Image 6 , the anti-skid marking 2 includes a resin-based adhesive bottom ...
Embodiment 2
[0036] like Figure 7 As shown, in this embodiment, the difference from Embodiment 1 is that a plurality of deceleration markings 3 distributed at horizontal intervals are also arranged on the road section inside the tunnel entrance hole inside the tunnel entrance 1 along the driving direction, and the tunnel exit 7 There are also multiple deceleration markings 3 distributed at horizontal intervals on the outer section of the tunnel exit, and the length of the section where the deceleration markings 3 are laid on the inner section of the tunnel entrance and the outer section of the tunnel exit is 40-250m . In this embodiment, the length of the road section where deceleration markings 3 are laid on the road section outside the tunnel entrance and the tunnel exit is 200±50m, and the section inside the tunnel entrance and the tunnel exit is laid with deceleration markings. The length of the road section 3 is 40-60m; the distance between the adjacent two groups of deceleration ma...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com