Resource management apparatus, resource management method and system
A resource management and resource manager technology, applied in the field of resource management devices, can solve the problems of complex signaling interaction, high AN performance requirements, disadvantageous and full utilization of transmission resources, etc., and achieves the effect of simple implementation and resolution of transmission resource conflicts.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0059] See Figure 6 , Figure 6 It is a flowchart of AN's management of transmission resources in the first embodiment of the present invention. The process can include the following steps:
[0060] Step 601: The UE initiates a request to the AN to join the multicast group in the AN, and requests to occupy transmission resources.
[0061] In this step 601, the above request may be an IGMP protocol message, and AN obtains the required transmission resources corresponding to the multicast group through pre-configuration; the above request may also be high-level signaling, such as Session Initiation Protocol (SIP) Messages, information about transmission resources required for multicast services can be carried in the Session Description Protocol (SDP, Session Description Protocol) carried by SIP.
[0062] Step 602: After receiving the resource request for occupying transmission resources, the D-RM in the AN can obtain the current usage status of the transmission resources, and perfo...
Embodiment 2
[0070] See Figure 7 , Figure 7 It is a flowchart of C-RM management transmission resources in the second embodiment of the present invention. The process can include the following steps:
[0071] Step 701: The AF sends a resource request to the C-RM to allocate transmission resources for the unicast service.
[0072] Step 702: The C-RM performs resource and admission control on the request of the AF according to the learned current usage status of the transmission resources.
[0073] In practical applications, C-RM can obtain the current usage status of transmission resources in the following two ways:
[0074] One may be that the AN reports the usage status of the transmission resources to the C-RM provided in the embodiment of the present invention. C-RM can learn the size of free resources in the current transmission resources based on the report;
[0075] The other is that the C-RM can be learned according to the usage status of the transmission resources recorded locally, a...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com