Sand prevention and well completion integrated packing and filling tool
A technology of sand control and tools, which is applied in the directions of sealing/isolation, production fluid, flushing of wellbore, etc., can solve the problems of high one-time investment cost, single function of process string, and influence on filling quality, etc., and achieve flexible and reliable opening and closing, The effect of expanding the seepage area and reducing the construction cost
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0033] refer to Figure 1-2 As shown, an integrated pack-off and packing tool for sand control and completion includes an upper joint 1, a sealing assembly, a packing assembly and a lower joint 27, and also includes a backwash assembly and a central pipe I5, an upper joint 1, a backwash assembly, and a central pipe Ⅰ5. The filling assembly and the lower joint 27 are fixedly connected sequentially from top to bottom, and the sealing assembly is sleeved on the outside of the center pipe Ⅰ5;
[0034] refer to Figure 6 As shown, the filling assembly includes a connecting collar 14, a central tube II 15, an outer spring 17, a long sheath 19, a filter ring 20, a sealing sleeve 21, a filling sleeve 24, a ball seat 25 and an inner spring 26, and the connecting collar 14 is fixedly installed At the lower end of the central pipe I5, it is fixedly connected with the central pipe II15, the sealing sleeve 21, the filling sleeve 24 and the lower joint 27 from top to bottom; Figure 7 As ...
Embodiment 2
[0042] As a preferred embodiment of the present invention, this embodiment adds an anti-erosion inner ring 23 in the filling sleeve 24 on the basis of the first embodiment, specifically:
[0043] refer to Figure 6 and Figure 8 As shown, in this embodiment, an anti-erosion inner ring 23 is provided on the inner wall of the filling sleeve 24 inside the filling hole 28, and the material of the anti-erosion inner ring 23 is a high-strength alloy with high impact resistance.
[0044] The anti-erosion inner ring 23 inside the filling hole 28 is made of high-strength alloy. The filling hole 28 adopts a scientific flow angle, which can reduce the eddy current erosion during the filling operation, and can withstand the maximum displacement of 5.5 cubic meters per minute and the highest sand ratio. 70%, the maximum pressure is 35MPa, and the maximum sand volume is 120 cubic meters of fracturing and filling operations.
Embodiment 3
[0046] As a preferred embodiment of the present invention, this embodiment optimizes the structure of the backwash assembly on the basis of Embodiment 2, specifically:
[0047] refer to image 3 As shown, in this embodiment, the backwash assembly includes a backwash jacket 2, a backwash sliding sleeve 4 and a return spring 3, the upper end of the backwash jacket 2 is fixedly connected to the upper joint 1, and its lower end is fixedly connected to the center pipe I5; The sliding seal of the backwashing sleeve 4 is set in the inner cavity of the backwashing sleeve 2, and the first annular space Y1 is formed between them; the lower part of the inner wall of the backwashing sleeve 2 is provided with a limit for limiting the downward movement of the backwashing sleeve 4 platform, the backwash jacket 2 on the upper part of the limiting platform is provided with a first through hole X1 communicating with the first annular space Y1, the upper end of the return spring 3 is in contact ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com