Sidewalk safety isolation facility for tunnel and design method of sidewalk safety isolation facility
A technology of safe isolation and design method, applied in road safety devices, roads, roads, etc., can solve the problems of the form, standard and principle of isolation facilities are not specified, it is inconvenient for technicians to identify and adopt, and it is difficult to ensure the safety of pedestrians, etc. The effect of preventing pedestrians from overturning, simple structure and improving structural strength
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment approach
[0056] As a preferred embodiment of the present invention, the step S2 includes:
[0057] S21, according to the formula Check and calculate the stress of the collision protection surface 140 per unit length along the tunnel longitudinal extension direction of the guardrail 110 under the preset standard load; wherein, q is the load standard value (kN / m), and y is the distance from the collision load to the calculation site (m), x is the thickness (m) of the guardrail 110, σ is the edge stress (kPa) of the collision protection surface 140, M is the section bending moment (kN.m), and w is the bending section coefficient, wherein the rectangular section is
[0058] S22, according to the structure where the maximum bending moment occurs, there is no tensile stress on the collision protection surface 140 to control the thickness of the bottom of the guardrail 110, so that σ=f t , and get the relationship between x and y: Among them, f t Design tensile strength of concrete (kP...
Embodiment
[0079] The present invention specifically describes how to set it up in conjunction with a certain tunnel 100 in Changsha City. The tunnel 100 is a section of an urban arterial road, which is set for crossing an 80m high mountain. The tunnel 100 has a length of 550m and a design speed of 50km / h. Due to the large amount of pedestrian traffic on the main road, the sidewalk 120 is arranged in the tunnel 100 in order to avoid slow traffic from affecting the passage of the main road. In order to save engineering investment, the sidewalk 120 and the carriageway 130 adopt the same hole arrangement, and the sidewalk 120 is only arranged on one side. The traffic lane 130 adopts a one-way two-lane mode, and the height of the sidewalk 120 above the traffic lane 130 is 25 cm. The value of the safety isolation facility is determined according to the concrete anti-collision wall 150 at the bottom and the isolation guardrail 160 at the top, and its value is determined according to the above...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com