Engineering cost assessment management system based on big data analysis

A technology of engineering cost and management system, applied in the field of engineering cost, can solve the problems of consuming the time and energy of building structure designers and installation engineering designers, affecting the progress and quality of the project, and accurately judging drawings, etc., so as to increase construction efficiency and facilitate the Effectiveness of managing and reducing budget deviations

Pending Publication Date: 2022-01-11
赵亮
View PDF0 Cites 5 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] The existing project cost is first estimated according to the architectural drawings of the building before construction and combined with the current cost. The drawings used are two-dimensional drawings. In the traditional two-dimensional drawing design, the design drawings of the structure, plumbing, electricity, etc. are summarized Finally, the inconsistency problem will be manually discovered and solved by the general drawing engineer, which will consume a lot of time and energy for the architectural structure designer and the installation engineering designer, and will affect the progress and quality of the project. The cost engineer cannot accurately judge the drawing when submitting the general drawing project. The cost budget can only be calculated in combination with the current two-dimensional drawings, because the rework caused by the uncoordinated design drawings of structures, plumbing, electricity, etc. requires certain calculations, resulting in inaccurate calculations
[0004] The existing project cost is often calculated based on the price of construction raw materials at the current stage. Usually, the construction period of a large building is long, and the price of construction materials will fluctuate under a long construction period, and there will be large fluctuations. Therefore, the current construction material price is used for cost budgeting There is a large budget deviation

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Engineering cost assessment management system based on big data analysis
  • Engineering cost assessment management system based on big data analysis
  • Engineering cost assessment management system based on big data analysis

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0027] This embodiment provides a project cost evaluation management system based on big data analysis, such as figure 1 , including the drawing module: organize the 2D engineering drawings of the entire building, the BIM module: establish the overall BIM model of the building through the 2D engineering drawings, and the estimation module: calculate the construction duration of the entire building according to the BIM model of the building, and the duration within the duration How many construction raw materials are needed in different stages, forecast module: according to the price of construction raw materials in different stages in the past, and the corresponding price fluctuation coefficient, establish a prediction model to predict the fluctuation coefficient of construction raw material prices within a certain period of time during the construction period; budget module, according to the forecast data Carry out the budget of manpower and materials in the project cost, and...

Embodiment 2

[0033] This embodiment provides a project cost evaluation management system based on big data analysis, such as image 3 , including the drawing module: organize the 2D engineering drawings of the entire building, the BIM module: establish the overall BIM model of the building through the 2D engineering drawings, and the estimation module: calculate the construction duration of the entire building according to the BIM model of the building, and the duration within the duration How many construction raw materials are needed in different stages, forecast module: according to the price of construction raw materials in different stages in the past, and the corresponding price fluctuation coefficient, establish a prediction model to predict the fluctuation coefficient of construction raw material prices within a certain period of time during the construction period; budget module, according to the forecast data Carry out the budget of manpower and materials in the project cost, and ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses an engineering cost assessment management system based on big data analysis, and relates to the technical field of engineering cost. The system comprises: a drawing module, which arranges a two-dimensional engineering drawing of a whole building; a BIM module, wherein the BIM model of the whole building is built through the two-dimensional engineering drawing; an estimation module, which is used for calculating the duration of the whole building according to the building BIM model and the building raw material quantity in different stages in the duration; a prediction module, wherein, according to the price of the building raw materials in different stages in the past and the corresponding price fluctuation coefficient, a prediction model is established to predict the fluctuation coefficient of the building raw material price in a certain time period in the building period; and a budgeting module, which is used for performing man-machine material budgeting in the engineering cost according to the prediction data, and budgeting the total cost by combining other costs in the engineering cost, so that the accurate engineering cost is budgeted.

Description

technical field [0001] The invention belongs to the technical field of engineering cost, and in particular relates to an engineering cost evaluation management system based on big data analysis. Background technique [0002] Project cost refers to the construction cost that constitutes the estimated or actual expenditure of the project during the construction period. It comprehensively uses the knowledge and skills of management, economics and engineering technology to predict, plan, control, account, analyze and evaluate the project cost, etc. The work process is called project cost management. In accordance with the procedures, methods and basis stipulated in laws, regulations and standards, the prediction or determination of project cost and its components is called project valuation. The project valuation basis includes the content of valuation, Valuation methods and price standards related to engineering measurement and valuation standards, project valuation quotas and ...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
IPC IPC(8): G06F30/13G06Q30/02G06Q50/08
CPCG06F30/13G06Q30/0206G06Q50/08
Inventor 赵亮
Owner 赵亮
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products