Underground building anti-floating pressure relief hole plugging structure and construction method thereof
A technology of underground construction and construction method, which is applied in the direction of infrastructure engineering, buildings, protection devices, etc., and can solve the problems of difficult sealing, easy formation of gaps, and poor sealing effect, so as to avoid leakage and ensure construction quality , The effect of extending the seepage path
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0033] Figure 1 to Figure 4 Shown is an underground building anti-floating pressure relief hole plugging structure, including a concrete cushion 3, a concrete floor layer 1 and a pressure relief hole 2, the upper part of the pressure relief hole 2 has an annular platform, and it is characterized in that the annular platform There is an annular groove 4 on the top, and a sealing plug 6 is arranged in the pressure relief hole 2. There is a water-stop buckle 9 above the sealing plug 6, and the water-stop buckle 9 fits in the annular groove 4 , the top of the water-stop buckle 9 is a concrete sealing layer 8 .
[0034] Such as image 3 As shown, the annular groove 4 and the annular platform are arranged concentrically. The arrangement of the annular groove 4 makes the annular platform form an annular boss 5, and the two are arranged concentrically, so that the thickness of the annular boss 5 is more uniform and the strength is higher.
[0035] The outside of the sealing plug 6...
Embodiment 2
[0041] The construction method of the anti-floating pressure relief hole plugging structure of the above-mentioned underground building comprises the following steps:
[0042] (1) The upper part of the pressure relief hole 2 is provided with an annular platform on the concrete floor layer 1;
[0043] (2) Open an annular groove 4 on the annular platform;
[0044] (3) Put the plug 6 tightly into the pressure relief hole 2;
[0045] (4) Press the water stop buckle 9 into the annular groove 4;
[0046] (5) Pour concrete above the water-stop buckle 9 to seal it.
[0047] In the step (3), the rubber tube 7 is tightly set on the sealing plug 6, and then it is smashed into the pressure relief hole 2 to leave a hole.
[0048] In step (3), the water in the opening of the pressure relief hole 2 and the annular groove 4 is cleaned first, and then the plugging cement slurry is poured above the sealing plug 6 until at least the annular groove 4 is filled.
[0049] The concrete in the co...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com