Prestressed anchoring structure system for pier assembly and pier assembly construction method
An anchoring structure and prestressing technology, which is applied in the direction of bridges, bridge materials, bridge construction, etc., can solve the problem of self-locking anchor performance, high requirements for construction sealing performance, complex structure of self-locking anchorage, self-locking anchorage The situation is difficult to detect and other problems, so as to achieve the effect of easy guarantee of anchorage quality, low construction precision requirements and simple structure
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0059] A prestressed anchorage structure system for pier assembly:
[0060] As shown in the figure, the prestressed anchorage structure system for pier assembly includes the bonded fixed-end anchorage I located in the abutment 11, the clip-type tensioned end anchorage II located on the top of the pier column 6, and the steel strands and Pre-buried pipe;
[0061] The bonded fixed-end anchor I located in the abutment 11 is composed of a trumpet-shaped anchor plate 16, an extrusion head 18 at the end of the steel strand 8, a high-strength mortar 15, a steel strand splitter plate 17 and an end cover. The plate 19 is composed of three through holes: through hole I1601, through hole II1602 and through hole III1603 at different heights of the hole wall on the side of the horn-shaped anchor plate 16;
[0062] The clip-type tension-end anchorage II located on the top of the pier column 6 is composed of clip 1, anchor plate 2, tension-end anchor backing plate 3 and spiral rib 4, and its ...
Embodiment 2
[0067] A bridge pier assembly construction method:
[0068] It adopts a kind of prestressed anchorage structure system for bridge pier assembly described in Embodiment 1 to realize the method for bridge pier assembly construction, including the following steps:
[0069] A. Pre-embedded installation of bonded fixed end anchorage and pouring of abutment:
[0070] A1. Pre-embedded installation of bonded fixed end anchorage:
[0071] Before the abutment is poured, the horn-shaped anchor backing plate 16 is vertically installed in the abutment 11, the end cover plate 19 is sealed and connected with the bottom surface of the horn-shaped anchor backing plate 16, the primary grouting pipe 14, the grouting pipe 13 and the secondary grouting pipe 12 are respectively connected to the three through holes on the side of the anchor plate—through hole I1601, through hole II1602, and through hole III1603, and the embedded pipe section II52 is sealed and connected to the top of the horn-shape...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com