Construction method of temporary support for concrete member dismantling operation
A technology of temporary support and construction method, which is applied in the direction of basic structure engineering, excavation, construction, etc., and can solve the problems of easy falling of broken components, and achieve the effect of accurate and reasonable selection and application, and high construction safety
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment
[0035] figure 1 Shown is a temporary support structure built in a demolition practice using the above method. In this demolition practice, the determination of the segmented position of the concrete component demolition depends on the material and structure of the concrete component to be demolished, the height of the volley, and the lifting use. Factors such as the load of the crane are planned in advance to ensure that the construction can proceed normally. In this practice, the concrete components are conventional materials, the structure is not complicated, and it is easy to cut into several rectangular blocks. The volley height is about 3 meters. The crane uses a crane with a rated lifting load of 10t , the final demarcated segment is 4 rectangular blocks of equal size; its temporary support structure includes base plate 1, support column 2, positioning rod 3, scissors brace 1, reinforcing rod 5 and scissors brace 2 6, which is different from the above implementation The ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com