A construction method for rapid water blocking and reinforcement near the pit wall of a deep foundation pit in a loose soil layer

A construction method and deep foundation pit technology, applied in infrastructure engineering, excavation, construction, etc., can solve problems such as costing money and time, losing the best time for effective treatment of water gushing, cracking, etc., to increase safety and stability Effect

Active Publication Date: 2022-07-15
广西壮族自治区地质环境监测站
View PDF0 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

Although the injected stones can slow down the water flow, the injected cement slurry still has the consequence of being diluted by the water flow
Moreover, the construction of large-diameter drilling itself is the damage to the surrounding soil layer of the foundation pit wall, and due to the limitation that the drilling holes cannot be connected and the diffusion range of stones in the stratum is small, it is difficult to cover the entire water gushing area with the method of injecting stones with large diameters. Especially for water gushing with high pressure and large flow rate, the above method is difficult to work. On the contrary, the best time to effectively control the gushing water will be lost due to construction, making it more difficult to block the gushing water, and even causing the foundation pit wall to become unstable and deformed. Even the consequences of collapse, resulting in engineering accidents
[0004] The existing method is to use polymer materials for grouting, but after the chemical reaction of the polymer materials, the volume of the reaction product will expand by a large multiple, and the expansion body will easily generate a large lateral pressure on the wall of the foundation pit. The wall of the foundation pit is extruded and deformed inward, and even cracked, bulged or even collapsed
There is also the use of micro-expansion quick-setting grout, but the grouting is not planned, the grouting sequence is not scientific and reasonable, and the concentrated water gushing is broken up, causing the wall of the foundation pit to expand the water gushing range, changing the concentrated water gushing into scattered water gushing, and making the water gushing disaster more serious. Complicated, it increases the difficulty of governance, consumes more money and time, and may also cause the consequences of failure to control water gushing

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • A construction method for rapid water blocking and reinforcement near the pit wall of a deep foundation pit in a loose soil layer
  • A construction method for rapid water blocking and reinforcement near the pit wall of a deep foundation pit in a loose soil layer
  • A construction method for rapid water blocking and reinforcement near the pit wall of a deep foundation pit in a loose soil layer

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0071] When the deep foundation pit of the Wanda station of the construction of Metro Line 3 in a city was excavated to a depth of 15m, a large flow of water appeared at 13m, with a water inflow of 50-70m 3 / h, the water volume of the water inflow continues unabated for one day. The water quality is black and carries silt, and the content of sand and silt is about 10-15%. According to the analysis of the exploration data, there is a gravel layer below 17m, which is a confined aquifer, and the water quality of the inflow water is the same as that of the gravel layer. Above the gravel layer are clay, silt and silt layers, and the water inflow points are located in the silt and silt layers. Due to the large amount of water inflow and the presence of certain water pressure, it poses a great threat to the stability of the foundation pit, and the collection of water inflow for a long time also causes the surrounding soil to be scoured and evacuated by the water inflow, resulting in...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a construction method for rapid water blocking and reinforcement near the pit wall of a deep foundation pit in a loose soil layer. and the maximum outer edge of the water influx area, and then after the compression body is built, the water influx area is strengthened and grouted first, then the water influx damage area is strengthened and grouted, and finally inspection and grouting are carried out. The construction method of the invention can not only fully ensure the safety and stability of the foundation pit wall, but also can effectively block the water gushing, quickly grouting and reinforce the water gushing area, and completely eradicate the hidden danger of water gushing.

Description

technical field [0001] The invention relates to the technical field of civil engineering, in particular to a construction method for rapid water blocking and reinforcement of a deep foundation pit in a loose soil layer near the pit wall. Background technique [0002] The deep foundation pits of high-rise buildings and urban tunnel foundation pits are generally designed in loosely covered soil layers because of their shallow burial. When underground diving or partially confined water is exposed during construction, the problem of a large amount of concentrated water inflow is very prominent. When a large amount of sediment is carried into the foundation pit during the water gushing, the surrounding soil layer of the foundation pit wall will be eroded away to form a cavity, and the risk of subsidence of the overlying stratum of the cavity is extremely high. The subsidence of the stratum and the erosion of the water inflow will also cause serious instability such as rupture, di...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): E02D17/02E02D19/16
CPCE02D17/02E02D19/16
Inventor 覃剑文吴福田月明刘春国陈友勇张洪顺
Owner 广西壮族自治区地质环境监测站
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products