Construction method and equipment for reducing settlement deformation of existing line
A construction method and existing line technology, applied in mining equipment, shaft equipment, earthwork drilling and mining, etc., can solve problems such as deformation of existing tunnels, and achieve the effect of avoiding excessive deformation
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0026] Hereinafter, exemplary embodiments according to the present application will be described in detail with reference to the accompanying drawings. Apparently, the described embodiments are only some of the embodiments of the present application, rather than all the embodiments of the present application. It should be understood that the present application is not limited by the exemplary embodiments described here.
[0027] figure 1 It is a schematic flowchart of a construction method for reducing settlement deformation of existing lines provided by an exemplary embodiment of the present application. like figure 1 As shown, the construction methods to reduce the settlement and deformation of existing lines include:
[0028] Step 110: Horizontally lay the interlocking pipe curtain on the top of the construction area below the existing line.
[0029] When the construction is under the existing line, in order to avoid the settlement of the existing line caused by the cons...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com