Multi-target scheduling method and system for minimizing delivery time and delay of high-end equipment

A scheduling method and multi-objective technology, applied in the field of task scheduling, can solve the problems that the non-dominated sorting genetic algorithm is easy to fall into local optimum, the algorithm is easy to fall into local optimum, and the algorithm has high time complexity, so as to shorten the delivery time and delay time, optimize the solution space, and expand the search range

Active Publication Date: 2021-06-01
HEFEI UNIV OF TECH
View PDF9 Cites 2 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

However, due to the existence of multiple Pareto optimal solutions for multi-objective problems and the high time complexity of the algorithm, the Non-Dominated Sorting Genetic Algorithm (NSGA-II) has the problem that it is easy to fall into local optimum, that is, the existing multi-objective Algorithms for Collaborative Scheduling Problems of Development Projects Are Easy to Fall into Local Optimum

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Multi-target scheduling method and system for minimizing delivery time and delay of high-end equipment
  • Multi-target scheduling method and system for minimizing delivery time and delay of high-end equipment
  • Multi-target scheduling method and system for minimizing delivery time and delay of high-end equipment

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0106] In order to make the purpose, technical solutions and advantages of the embodiments of the present invention clearer, the technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the embodiments of the present invention. Obviously, the described embodiments are part of the present invention Examples, not all examples. Based on the embodiments of the present invention, all other embodiments obtained by persons of ordinary skill in the art without creative efforts fall within the protection scope of the present invention.

[0107] The embodiment of the present invention provides a multi-objective scheduling method oriented to the minimum delivery time and delay of high-end equipment, including steps S1-S10, the flow chart of the method is as follows figure 1 shown.

[0108] S1. Obtain the task data of high-end equipment, set the input parameters of the improved non-dominated sorting genetic algorit...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention provides a multi-target scheduling method for minimizing delivery time and delay of high-end equipment, and relates to the technical field of task scheduling. After the parent population is generated, the parent population is divided into a plurality of small populations, different quick sorting and crowding degree calculation rules are set for the plurality of small populations, the plurality of small populations can intersect in the evolution process, excellent genes in individuals can be spread among the populations. The whole population is effectively prevented from falling into a local optimal solution, the search range of the optimal solution is expanded, and the effect of the optimal scheduling scheme is effectively improved. Through the method provided by the invention, the development project collaborative scheduling problem of minimizing the project delivery time and delivery delay is effectively solved, the delivery time and delay time of multiple projects are shortened, and meanwhile, a good decision basis can be provided when an enterprise makes a plan.

Description

technical field [0001] The invention relates to the technical field of task scheduling, in particular to a multi-objective scheduling method and system for minimum delivery time and delay of high-end equipment. Background technique [0002] The collaborative scheduling problem of multi-objective R&D projects is a typical combinatorial optimization problem, which generally exists in the R&D and manufacturing of high-end equipment. The development of high-end equipment such as launch vehicles not only needs to consider the constraints of resources and places, but also needs to consider multiple project goals such as minimizing project delivery time and minimizing project delivery delays. In the research and development process of high-end equipment, minimizing the project delivery time is of great significance to the cost saving of the enterprise, and minimizing the project delivery delay is of great significance to the punctual delivery of the enterprise. These two goals are ...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): G06Q10/06G06Q10/04G06N3/00
CPCG06Q10/06311G06Q10/04G06N3/006
Inventor 刘心报裴军卢燕庆范新中程浩周志平崔龙庆钱晓飞陆少军
Owner HEFEI UNIV OF TECH
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products