Post-planting installation method for rubber waterstop
A technology of rubber waterstop and installation method, which is applied in the direction of shaft equipment, protection device, earthwork drilling and mining, etc.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0023] example figure 1 and figure 2 The post-planting installation method used for the rubber waterstop of the present invention comprises the following steps:
[0024] Step 1. Slot 2 on both sides of the wall 11, the top 12 and the bottom 13 where the rubber water stop is installed, play the center line of the rubber water stop, and use a Φ100 drill to drill holes along the center line. The hole overlap is 20mm, and the hole depth is 150mm;
[0025] Step 2. After drilling, use steel drill to remove the hole cores one by one to form installation groove 2, and the middle of individual hole cores is broken, and use steel drill to penetrate into installation groove 2 to remove the hole cores from the root until the bottom of the groove is flat and has no protrusions;
[0026] Step 3. Cut the rubber waterstop according to the sum of the lengths of the installation grooves 2 on both sides, the top and the bottom of the wall, plus the lap length of 300mm, and the sides of the cu...
PUM
Property | Measurement | Unit |
---|---|---|
length | aaaaa | aaaaa |
power level | aaaaa | aaaaa |
strength | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com