Pipe gallery operation and maintenance safety dynamic evaluation method
A technology of operation and maintenance safety and evaluation method, applied in the direction of resources, instruments, computer parts, etc., can solve the problems of lack of dynamic safety evaluation and rigid methods.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0043] like figure 1 As shown, a dynamic evaluation method for utility tunnel operation and maintenance safety, including:
[0044] A method for dynamic evaluation of utility tunnel operation and maintenance safety, comprising:
[0045] S1. According to the risk events of the operation and maintenance safety of the pipeline corridor, sort out the safety elements of the man-machine-material legal circle of the operation and maintenance safety of the pipeline corridor, and determine the safety element data set;
[0046]S2. According to risk events, judge the risk evaluation level and risk occurrence probability of each safety element respectively, and quantify the risk evaluation level and risk occurrence probability; among them, the number of risk evaluation levels is not less than 5 levels, which can ensure Accuracy in risk assessment. In this embodiment, the number of levels is 6.
[0047] S3. Analyze the correlation and degree of influence among the security elements to o...
Embodiment 2
[0062] Different from Embodiment 1, S1 of this embodiment is also used to update security elements; in S5, abnormality analysis results are also displayed in the form of images. Specifically, the images are displayed in a color-coded manner. In this embodiment, green indicates safety, yellow indicates hidden dangers, and red indicates risks are occurring.
[0063] It is convenient for staff to understand the specific situation of abnormal analysis, and the way of color marking is simple and clear, and the overall situation is clear at a glance.
Embodiment 3
[0065] Different from Embodiment 1, in S5 of this embodiment, if the abnormality analysis result indicates that there is an abnormality, it is also graded according to the severity of the abnormality. If the level of abnormality is higher than the preset alarm level, an alarm will be issued. In this embodiment, the way of alarm is sound and light alarm.
[0066] In this way, in addition to knowing the specific situation of the abnormality, even inexperienced staff can clearly understand the specific severity of the abnormality. If the abnormal level exceeds the alarm level, it means that it needs to be dealt with in time, so an alarm is issued to remind the staff that there is an abnormality and deal with it in time. The way of sound and light alarm can attract the attention of the staff.
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com