Application of P-BIAS-based fabricated building full life cycle management

A P-BIAS, full life cycle technology, applied in data processing applications, special data processing applications, geometric CAD, etc., can solve the problem of the development of industrial chemical personnel in the construction industry, the inability to reuse BIM models, and the development of industrial chemical personnel. Slowness and other problems, to achieve the effect of shortening the construction period, improving the accuracy, and standardizing the operation standards

Pending Publication Date: 2021-01-29
SHANXI INSTALLATION GRP CO LTD
View PDF0 Cites 2 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0002] The current status of BIM+ assembly: 1. There is no complete BIM+ assembly management system, collaborative management at each stage does not exist, and management efficiency is not high; 2. There is no close connection between each link, resulting in BIM models that cannot be reused, and repeated construction at each stage 3. The development of the industrialization workforce is slow, and the corresponding BIM construction technology is less, which is not easy to promote the development of the industrialization workforce in the construction industry

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0010] The present invention is based on the application of the BIM+ project collaborative management platform throughout the entire life cycle of BIM. BIM is the key technology and the best platform in the prefabricated building system. Through the establishment of the "P-BIAS" system, the management process of the whole life cycle of the prefabricated building has been scientifically and systematically improved, and coordinated information is provided for the project. The whole industry chain of modern buildings provides strong support, and the combing of Internet of Things technology can quickly collect and integrate information at each stage, and can feedback information in a timely manner. In an era when industrial elements and information elements are more and more closely connected, BIM technology will achieve perfect integration with prefabricated buildings and promote the innovative development of buildings.

[0011] Based on "P-BIAS", the present invention takes "P" ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

Provided is an application of P-BIAS-based fabricated building full life cycle management to solve defects in the prior art. The factory production precision is improved, and the potential safety hazard of form removal is reduced; The invention reduces concrete pouring on the field and waste of material and promote green construction, the technical scheme adopted by the invention is as follows: the application of P-BIAS-based fabricated building full life cycle management and based on a BIM + project collaborative management platform, an improved assembly project comprises the full-life-cyclecomprehensive management capacity of the fabricated project including BIM deepening design, factory production, fabricated construction and intelligent operation and maintenance is improved, collaborative construction management of data, models, progress, quality, safety and cost is carried out on the related project in combination with BIM model digital information, and finally application of core competitiveness data assets to the full life cycle is formed. The invention can be widely applied to the field of constructional engineering.

Description

technical field [0001] The present invention is an application based on "P-BIAS" prefabricated building life cycle management, which belongs to the technical field of construction engineering. Background technique [0002] The current status of BIM+ assembly: 1. There is no complete BIM+ assembly management system, collaborative management at each stage does not exist, and management efficiency is not high; 2. There is no close connection between each link, resulting in BIM models that cannot be reused, and repeated construction at each stage 3. The development of the industrialization workforce is slow, and the corresponding BIM construction technology is less, which is not easy to promote the development of the industrialization workforce in the construction industry. Contents of the invention [0003] The present invention overcomes the deficiencies in the prior art, provides an application based on the "P-BIAS" prefabricated building life cycle management, improves the...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): G06Q10/10G06Q50/08G06F30/13G06F30/20G16Y10/30
CPCG06Q10/103G06Q50/08G06F30/13G06F30/20G16Y10/30
Inventor 王丰梁波宋文帅张旭雍琦薛锐
Owner SHANXI INSTALLATION GRP CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products