Journey planning system and method based on big data
A technology of itinerary planning and big data, applied in data processing applications, instruments, forecasting, etc., can solve the problems of increasing the carrying capacity of scenic spots, increasing the amount of system calculation, and inaccurate calculation results.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0061] Such as figure 1 A travel planning system based on big data is shown, including an information input module, an analysis module, a plan output module and a data statistics module,
[0062] The information input module is used to collect input demand information;
[0063] The analysis module is used to generate the main scenic spot scheme and the alternative scenic spot scheme according to the demand information, calculate the expected play time of the main scenic spot scheme and the alternative scenic spot scheme, and send the main scenic spot scheme to the scheme output module; The real-time play time of the scenic spot, calculate the current play time of the main scenic spot plan and the alternate scenic spot plan, compare the expected play time with the current play time, and output to the plan when the current play time of the main scenic spot plan and the alternate scenic spot plan meets the preset conditions The module sends alternative scenic spot schemes that m...
Embodiment 2
[0072] On the basis of embodiment 1, the demand information includes the intended scenic spot, the starting place and the duration of the tour, the analysis module matches the intended scenic spot, and obtains the non-intended scenic spot adjacent to the intended scenic spot based on the intended scenic spot, and retrieves the intended scenic spot. The historical play time of the scenic spot and the non-intended scenic spot, based on the length of the tour and the historical play time, multiple scenic spot plans are obtained, as well as the estimated play time corresponding to the scenic spot plan. The scenic spot plan includes at least one intended scenic spot; Screen out the main scenic spot scheme, use the remaining scenic spot schemes as alternative scenic spot schemes, and sort the alternative scenic spot schemes according to the second screening condition; the first screening condition is to include the scenic spot scheme with the largest number of intended scenic spots as...
Embodiment 3
[0075] On the basis of the above embodiments, the preset condition of the system is that the current play time of the alternative scenic spot scheme is less than the expected play time of the alternative scenic spot scheme, or the current play time of the alternative scenic spot scheme is greater than the expected play time of the alternative scenic spot scheme time, and the current play time of the main scenic spot plan is also greater than the expected play time of the main scenic spot plan.
[0076] In one or more embodiments, the current play time of the alternative scenic spot scheme is not greater than 70-80% of its expected play time.
[0077] In some embodiments, when the current play time of the alternative scenic spot plan is greater than the expected play time of the alternative scenic spot plan, and the current play time of the main scenic spot plan is also greater than the expected play time of the main scenic spot plan, the pushed alternative scenic spot plan The...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com