Maintenance method for manufacturing foam concrete member
A technology of foam concrete and components, which is applied in the field of maintenance when making concrete components by self-heating, which can solve problems such as melting of insulation pipes, high curing temperature, product cracks, etc., and achieves the effects of easy operation, low energy consumption, and low investment
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
specific Embodiment 1
[0009] Add the foamed concrete slurry with a temperature of 40°C into the thermal insulation mold. At this time, the temperature of the foamed concrete slurry in the thermal insulation mold is continuously increased, and the initial setting time and final setting time of the cement in the foamed concrete slurry are controlled. The temperature of the foamed concrete slurry and the components formed by the foamed concrete slurry is kept within 69°C during the period from 0.5 hours before the final setting time of the cement to 4 hours after the final setting time of the cement, and the temperature is maintained for about 11 hours. Complete the maintenance process.
specific Embodiment 2
[0011] Add the foamed concrete slurry with a temperature of 36°C into the thermal insulation mold. At this time, the temperature of the foamed concrete slurry in the thermal insulation mold is continuously increased, and the initial setting time and final setting time of the cement in the foamed concrete slurry are controlled. The temperature of the foamed concrete slurry and the components formed by the foamed concrete slurry is kept within 60°C during the period from 0.5 hours before the final setting time of the cement to 5 hours after the final setting time of the cement, and the temperature is maintained for about 11 hours. Complete the maintenance process.
specific Embodiment 3
[0013] Add the foamed concrete slurry with a temperature of 32°C into the thermal insulation mold. At this time, the temperature of the foamed concrete slurry in the thermal insulation mold is continuously increased, and the initial setting time and final setting time of the cement in the foamed concrete slurry are controlled. The temperature of the foamed concrete slurry and the components formed by the foamed concrete slurry is kept within 50°C during the period from 0.5 hours before the final setting time of the cement to 5 hours after the final setting time of the cement, and the temperature is maintained for about 12 hours. Complete the maintenance process.
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com