Dispatching method of ice storage air conditioning system
An ice-storage air-conditioning and scheduling method technology, which is applied in air-conditioning systems, heating and ventilation control systems, heating and ventilation safety systems, etc., and can solve problems such as ice-storage systems that cannot find models
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0074] This embodiment introduces a scheduling method for an ice storage air-conditioning system, including:
[0075] Obtain real-time system operation data, load forecast data, equipment operation and maintenance plan data and system equipment parameters;
[0076] Determine the boundary conditions for optimal scheduling based on the acquired data;
[0077] According to the boundary conditions of optimal scheduling, aiming at the lowest operating cost of the system within the scheduling period, the optimal scheduling calculation is carried out using the pre-determined optimal scheduling model, and the hourly start-up numbers of base-load units and dual-working condition units and the gradual ice-melting volume are obtained. time load;
[0078] According to the optimized dispatching results, determine the load level within the optimized period;
[0079] According to the preset equipment start-stop adjustment strategy, according to the determined load level, adjust the equipme...
Embodiment 1-1
[0082] refer to figure 1 , on the basis of embodiment 1, in this embodiment:
[0083]The method also includes: based on the adjusted start-stop period of the equipment, and according to a preset load rate adjustment strategy, optimizing and adjusting the hourly operating load rates of the base-load unit and the dual-working condition unit.
[0084] The following describes this embodiment in detail, mainly involving the following processes:
[0085] 1. Data acquisition and calculation
[0086] The data that needs to be obtained in this embodiment includes real-time equipment operation data, hourly load forecast, equipment operation and maintenance plan, equipment operation energy efficiency ratio and other information.
[0087] After obtaining the data, the calculated load_b of the base load unit, the calculated load load_d of the dual-working condition unit, the power consumption consum_b of the unit cooling capacity of the base-load unit, the power consumption consum_d of t...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com