Bridge construction management system based on BIM

A management system and bridge construction technology, applied in the direction of bridges, bridge construction, erection/assembly of bridges, etc., can solve the problems of repeated modeling of construction units, low value of design models, and inability to establish data transmission, etc., to achieve rapid modification and Effects of adjustment, continuous optimization of construction organization design, and continuous optimization of design schemes

Pending Publication Date: 2020-11-20
GUANGXI ROAD & BRIDGE ENG GRP CO LTD
View PDF12 Cites 15 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0002] At present, BIM technology has been applied in full swing in the engineering construction industry, but there is still an embarrassing phenomenon that the design unit and the construction unit model their own models according to their needs, and it is still impossible to establish a set of BIM models based on the same BIM model between the design and construction units. The unique data transmission and information transmission mechanism, there is an isolated island of information transmission, which leads to the embarrassing situation that the design model is of little value and the construction unit repeats the modeling

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Bridge construction management system based on BIM
  • Bridge construction management system based on BIM
  • Bridge construction management system based on BIM

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0042] The specific implementation of the invention will be further described below in conjunction with the accompanying drawings.

[0043] A typical embodiment of the present application provides a bridge construction management system based on BIM. Taking the Longtan Tianhu Super Bridge as a pilot point, through the application of BIM technology, the difficulties and pain points in the bridge design and construction process are solved, breaking the To overcome technical barriers between design and construction in terms of model delivery, information transmission, and data interoperability, establish an effective BIM collaborative application and communication mechanism between design and construction, and form a demonstration project for joint application of engineering BIM.

[0044] The system includes digital integration delivery stage, design and construction collaborative work stage, design stage and construction stage. The IPD mode is realized through BIM technology, wh...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a bridge construction management system based on BIM, and belongs to the technical field of bridge construction management. Key points of the technical scheme are as follows: the system comprises a design stage and a construction stage, the design stage is used for designing a scheme framework of a bridge. On the basis of the scheme framework, the framework is split to a construction installation unit to form a parameter table; a bridge BIM model is constructed, three-dimensional numerical finite element analysis is performede, engineering quantity calculation is performed on the bridge BIM model, cost data is generated, a part drawing is formed according to the bridge BIM model, and three-dimensional construction simulation is achieved according to the bridge model; in the construction stage, error checking is carried out through a point cloud model in combination with a bridge BIM model, and the earth-rock engineering quantity is calculated through an unmannedaerial vehicle and the BIM technology to obtain the accurate filling and digging quantity. According to the system, the technical barriers in the aspects of model delivery, information transmission and data interaction between design and construction are broken through, and an effective BIM collaborative application and communication mechanism between design and construction is established.

Description

technical field [0001] The invention relates to the technical field of bridge construction management, in particular to a BIM-based bridge construction management system. Background technique [0002] At present, BIM technology has been applied in full swing in the engineering construction industry, but there is still an embarrassing phenomenon that the design unit and the construction unit model their own models according to their needs, and it is still impossible to establish a set of BIM models based on the same BIM model between the design and construction units. The unique data transmission and information transmission mechanism, there is an isolated island of information transmission, which leads to the embarrassing situation that the design model is of little value and the construction unit repeats the modeling. As the key control engineering of highway projects, extra-large bridges have high social attention, complex technology, large engineering volume, and high inv...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): G06F30/13G06F30/23G06T17/05G06T19/00G06Q10/10G06Q50/08G06Q50/20E01D21/00G06F111/10G06F111/18
CPCG06F30/13G06F30/23G06T17/05G06T19/00G06Q10/103G06Q50/08G06Q50/205E01D21/00G06F2111/10G06F2111/18G06T2210/04
Inventor 孙辉马文安杜海龙韩玉林广泰李彩霞解威威覃献康王建军程振庭谢灿荣王勇朱觉文梁才侯泽群陆进陈孝强唐雁云郑健欧晨丰程立飞
Owner GUANGXI ROAD & BRIDGE ENG GRP CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products