Power grid main equipment blackout window period determination method and system
A window period, main equipment technology, applied in information technology support systems, electrical components, circuit devices, etc., can solve the problems of equipment accompanying shutdown, unscientific power grid blackout window period, and power grid security hidden dangers, etc. Stop, reduce power grid security risks, and determine the effect of scientific and reasonable methods
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0032] figure 1 It is a schematic diagram of the method for determining the power outage window period of the main equipment of the power grid. Such as figure 1 As shown, the present invention provides a method for determining the power outage window period of the main equipment of the power grid. The method includes:
[0033] Step 1: Determine the classification type of the function classification of the power transmission and transformation equipment in the power grid according to the functions of the power transmission and transformation equipment;
[0034] In this step, the classification types of the function classification include: wind power transmission channel equipment, hydropower transmission channel equipment, photovoltaic transmission channel equipment, nuclear power transmission channel equipment, thermal power transmission channel equipment, cross-regional equipment and those that have an impact on the cross-regional channel capability Equipment, cross-provinc...
Embodiment 2
[0123] Figure 10 It is a schematic diagram of the system structure for determining the power outage window period of the main equipment of the power grid. The system for determining the power outage window period of the main equipment of the power grid includes:
[0124] A determining module, configured to determine the classification type of the function classification of the power transmission and transformation equipment in the power grid according to the functions of the power transmission and transformation equipment;
[0125] A collection module, configured to collect basic data corresponding to the classification type according to the classification type;
[0126] A judging module, configured to determine the blackout window period of the power transmission and transformation equipment according to the basic data;
[0127] The output module is used to output and display the blackout window period.
[0128] Preferably, the classification types of the function classif...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com