Building construction progress management method

A progress management and construction technology, applied in the field of construction, can solve the problems of only intuitively showing the quality of construction, unable to quickly calculate, and inconvenient to quickly know the current construction progress and expected construction progress, etc., to achieve efficient control and ensure smooth progress. , the effect of improving the ability

Inactive Publication Date: 2020-11-06
城光建设有限公司
View PDF3 Cites 7 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0004] The purpose of the present invention is: in order to solve the current construction progress management and control process, most of the actual progress is checked by relevant technical personnel, and the progress confirmation form and image data are filled in. The calculation and comparison process is relatively complicated. It is convenient to quickly know the difference between the current construction progress and the expected construction progress, and it cannot be calculated quickly and only intuitively shows the problem of the current project construction quality, and a construction construction progress management method is proposed

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Building construction progress management method
  • Building construction progress management method

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0042] The following will clearly and completely describe the technical solutions in the embodiments of the present invention with reference to the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only some, not all, embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by persons of ordinary skill in the art without creative efforts fall within the protection scope of the present invention.

[0043] see Figure 1-2 , the present invention provides a technical solution: a construction progress management method, comprising the following steps:

[0044] Step S1: Obtain the design parameters and professional design standards of the construction project;

[0045] Step S2: Based on the design parameters and professional design standards, create a structural analysis model of the construction building;

[0046] Step S3: Calculating the structural analysis m...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a building construction progress management method, which belongs to the technical field of building construction. The method comprises the following steps: S1, obtaining design parameters and professional design standards of a building engineering project; and S2, establishing a structural analysis model of the construction building by taking the design parameters and theprofessional design standard as references. In the present invention, the engineering progress and cost can be managed and controlled more efficiently in the engineering project construction process;the capability, the efficiency and the level of BIM technology application are effectively improved; the actual BIM model of the construction building is compared with the virtual BIM model of the built curtain wall; the progress difference and reasons can be found out conveniently, measures can be taken to ensure implementation of a progress plan, meanwhile, the construction quality of engineering can be detected, effective measures can be taken conveniently in time, the construction progress can follow up the construction plan in a quality-guaranteeing and quantity-guaranteeing mode, so thatthe engineering is implemented according to the plan and is pushed smoothly.

Description

technical field [0001] The invention belongs to the technical field of building construction, and in particular relates to a method for managing the progress of building construction. Background technique [0002] Building construction refers to the production activities in the implementation stage of engineering construction. It is the construction process of various buildings. It can also be said to be the process of turning various lines on the design drawings into physical objects at designated locations. It includes basic engineering construction. , main structure construction, roofing engineering construction, decoration engineering construction, etc., the place where the construction work is called "building construction site" or "construction site", also called construction site. [0003] With the acceleration of industrialization and urbanization, the construction of buildings has become the norm. People pay more attention to the quality of buildings and constructio...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): G06Q10/10G06Q10/06G06Q50/08
CPCG06Q10/103G06Q10/06395G06Q50/08
Inventor 黄晓寿黄华燕缪建静
Owner 城光建设有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Eureka Blog
Learn More
PatSnap group products