Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

Management system for checking construction project fund

A management system and construction engineering technology, applied in data processing applications, instruments, finance, etc., can solve problems such as error-prone reports, property loss of workers, and inability to play corresponding roles, so as to protect its own interests and improve versatility Effect

Pending Publication Date: 2020-10-02
厦门求实智能网络设备有限公司
View PDF5 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0002] For the construction industry, the daily entry and exit of materials, project appropriations, workers’ expenses, transportation expenses and other payments need to be recorded clearly. Due to the large number of projects involved, the reports are prone to errors. Existing project funds are checked. The management system used can only be accessed and logged by internal personnel, and it cannot play a corresponding role for workers. Moreover, some construction site contractors will manipulate workers' wages for corruption, so that they cause property damage to workers. loss on

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Management system for checking construction project fund
  • Management system for checking construction project fund
  • Management system for checking construction project fund

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0029] Embodiment 1 (when the administrator uses the system):

[0030] First, the administrator logs in to the system with the account of the administrator, and the system jumps to the main page. Click the corresponding item unit with the mouse to switch to the receivable item unit or the payable item unit. In the receivable item unit, click the mouse Switch to the project payment page, company appropriation page or other receivables page, and then input accurate information according to the information in the corresponding column, and finally save it. In the accounts payable unit, you can switch to material payment, labor service payment, Machinery payment, transportation payment, project department expenditure and other payables pages, and then, enter the accurate information according to the information in the corresponding column, and finally save it, and you can directly click the export button on each page to transfer the information of the page Export the information an...

Embodiment 2

[0031] Embodiment 2 (when employees use the system):

[0032] First, the employee enters his job number information, logs in to the system, and the system jumps to the self-query page, and then the employee can click the DateTimePicker control to select the range of information to be exported, and then select the category CheckBox space, and select paid information or unpaid information. Select the payment information or both, then export and generate an Excel file, and exit the system after exporting.

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention relates to the technical field of constructional engineering, in particular to a management system for checking a constructional project fund, and solves the defects in the prior art. The system comprises a login unit, an account receivable unit, an account payable unit and a self-query unit. The login unit comprises an administrator module and an employee module; the receivable account unit comprises a project fund subunit, a company appropriation subunit and other account receivable subunits; the account payable unit comprises a material fund unit, a labor fund unit, a mechanical fund unit, a transportation fund unit, a project department expenditure sub-unit and other account payable sub-units; and the self-query unit comprises a job number subunit, a time subunit and a category subunit. According to the invention, on the one hand, an administrator can conveniently check and manage the project fund; on the other hand, employees can conveniently check their own wage details in real time, so the universality of the system is improved, and the own benefits of the employees are guaranteed.

Description

technical field [0001] The invention relates to the technical field of construction engineering, in particular to a management system for checking construction project funds. Background technique [0002] For the construction industry, the daily entry and exit of materials, project appropriations, workers’ expenses, transportation expenses and other payments need to be recorded clearly. Due to the large number of projects involved, the reports are prone to errors. Existing project funds are checked. The management system used can only be accessed and logged by internal personnel, and it cannot play a corresponding role for workers. Moreover, some construction site contractors will manipulate workers' wages for corruption, so that they cause property damage to workers. on the loss. Contents of the invention [0003] The purpose of the present invention is to solve the shortcomings in the prior art, and propose a management system for construction project payment verificati...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): G06Q10/10G06Q40/00G06Q50/08
CPCG06Q10/103G06Q40/12G06Q50/08
Inventor 张安东
Owner 厦门求实智能网络设备有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products