Agile satellite scheduling method considering time-dependent conversion time
A time-conversion and time-dependent technology, applied in the field of satellite scheduling, can solve the problems of low scheduling efficiency, lack of time-dependent characteristics, and neglect of time-dependent characteristics of conversion time.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0075] Figure 1 to Figure 7 It shows a specific embodiment of the agile satellite scheduling method of the present invention considering time-dependent conversion time, including the following steps, such as figure 2 Shown:
[0076] Step 1: Obtain the target sequence to be observed and preprocess it;
[0077] Step 2: Build an agile satellite scheduling model whose time depends on the transition time;
[0078] The time-dependent switching time agile satellite scheduling model constructed in this embodiment is firstly based on the fact that the switching time satisfies the first-in-first-out rule and the triangle inequality rule.
[0079] (1) First in first out rule (FIFO rule)
[0080] The first-in-first-out rule means that assuming that the satellite has two different observation start times t for the previous observation task i and t j (t i j ), after the attitude conversion, t j The arrival time of the corresponding next task is no earlier than t i corresponding ar...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com