Embodiment 1
[0031] Embodiment 1: see attached Figure 1-2 , a continuous diversion and energy dissipation spillway, which consists of a diversion control section 1, an arc-shaped stilling pier 2, an arc-shaped diversion partition wall 3, a side wall 4, a bottom plate 5, and a deflecting energy dissipation section 6. The arc-shaped stilling pier 2, the arc-shaped diversion wall 3, the side wall 4 and the bottom plate 5 are integrally poured; the arc-shaped stilling pier 2 and the arc-shaped diversion wall 3 are both arc-shaped in the vertical water flow direction; The arc-shaped stilling pier 2 is located on the center line of the spillway, and the arc-shaped diversion wall 3 is symmetrically arranged on both sides of the downstream of the arc-shaped stilling pier 2; the width of the middle gap of a group of arc-shaped diversion walls 3 is the spillway 1 / 4 of the width; the intersection point of the left and right arc surfaces of the arc-shaped diversion partition wall 3 intersects with th...
Embodiment 2
[0036] Embodiment 2: see attached image 3 , a continuous diversion and energy dissipation spillway, which is composed of arc-shaped stilling pier 2, arc-shaped diversion partition wall 3, side wall 4, partition wall 8 and floor 5; when the spillway is wide, a partition wall is added to it 8. Divide it evenly. In this embodiment, the spillway is divided into 5 spillways, and then an energy dissipation unit 7 is arranged in each spillway; 3. The side wall 4, the partition wall 8 and the bottom plate 5 are integrally poured; the width of the middle gap of each group of arc-shaped diversion partition walls 3 is 1 / 4 of the width of the flood discharge channel; the length of the partition wall 8 is less than the side wall 4, and the height It is equal to the side wall 4; the height of the arc-shaped diversion partition wall 3 is 1 / 3 of the height of the side wall 4 . Other structures are basically the same as in Embodiment 1.
[0037] Working principle: In this scheme, under the ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com