High-voltage transmission line construction distance early warning device and method

A technology for high-voltage transmission lines and early warning devices, which is used in measurement devices, alarms, electrostatic field measurements, etc., can solve problems such as difficulty in dealing with complex working environments, complicated device fabrication and installation, and inapplicability to large-scale machinery, so as to facilitate the reception of alarm signals. , High alarm reliability, accurate and reliable alarm effect

Inactive Publication Date: 2020-05-29
STATE GRID HENAN ELECTRIC POWER COMPANY ZHENGZHOU POWER SUPPLY +2
View PDF13 Cites 4 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

Existing near-electrical alarm devices often have problems such as single alarm criteria and inapplicability to large machinery
In addition, there are also the following deficiencies to varying degrees: difficult to cope with complex working environments, complicated device production and installation, small monitoring range, and no early warning

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • High-voltage transmission line construction distance early warning device and method
  • High-voltage transmission line construction distance early warning device and method
  • High-voltage transmission line construction distance early warning device and method

Examples

Experimental program
Comparison scheme
Effect test

Embodiment

[0034] Example: see figure 1 , figure 2 , image 3 , Figure 4 , Figure 5 and Image 6 .

[0035] The high-voltage transmission line construction distance warning device and method thereof include two parts, a measuring end and an alarming end, the circuit structure and which are both installed in a casing, and powered by a power module. The electric field sensor at the measurement end is connected to the input end of the controller through a signal processing circuit, the distance measuring sensor is connected to the input end of the controller, and at the same time, the controller is connected to the wireless transmission module. The wireless data transmission module of the alarm terminal is connected with the controller, and the working mode setting key is installed on the casing, which is connected to the controller through the working mode setting module, and the output terminal of the controller is connected to the voice control module and the lighting control mod...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses a high-voltage transmission line construction distance early warning device and method, and the device comprises a measurement end and an alarm end, and the circuit structuresof the measurement end and the alarm end are installed in a shell and are powered by a power module. The electric field sensor at the measurement end is connected with the input end of a controller through a signal processing circuit, a distance measuring sensor is connected with the input end of the controller, and the controller is connected with a wireless transmission module; an alarm end wireless data transmission module is connected with the controller, a working mode setting key is installed on the machine shell and connected into the controller through a working mode setting module, the output end of the controller is connected with a voice control module and a light control module, the voice control module is connected with an alarm and a buzzer, and the light control module is connected with a light emitting diode. The measurement equipment and the alarm equipment which are of a split structure are arranged, the measurement equipment can be arranged at the top end of the construction equipment, the operator holds the alarm equipment by hand, long-distance detection and alarm are achieved and the working environment of large mechanical equipment is met.

Description

Technical field: [0001] The invention relates to construction auxiliary equipment, in particular to a high-voltage transmission line construction distance warning device and method thereof. Background technique: [0002] Tripping and electric shock accidents caused by construction machinery touching or being too close to high-voltage transmission lines occur from time to time. Such accidents seriously threaten the safe operation of the power grid, and may cause large-scale power outages, personal casualties, and equipment damage. Traditional solutions include setting up safety warning signs and setting up bamboo raft protection barriers, etc., which are mainly judged by visual inspection, and the accuracy is low. There is no corresponding prompt for whether the transmission line is live, whether the operator and the construction machinery enter the high field strength area. It is highly dependent on the experience and quality of operators and has poor reliability. [0003...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): G01D21/02G01S15/08G01S15/93G01R29/14G08B19/00
CPCG01D21/02G01S15/08G01S15/93G01R29/14G08B19/00
Inventor 杨富磊张松刚高峰邝石王麒何正浩殷铭丛建军路征李鹏飞祁志远韩兴启刘世鹏郭裕祺赵杨吴俊鹏姚军帅谢文文高尚陶一伟韩镇宇
Owner STATE GRID HENAN ELECTRIC POWER COMPANY ZHENGZHOU POWER SUPPLY
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products