Dam break flood demonstration and early warning method and platform based on BIM technology
A kind of flood and technical technology, which is applied in the field of earth-rock dam failure flood risk assessment, to reduce property losses and avoid casualties
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0047] The present invention will be described in detail below in conjunction with the accompanying drawings and specific embodiments.
[0048] The present invention provides a method for demonstration and early warning of dam break flood based on BIM technology, such as figure 1 As shown, based on BIM technology, software platforms such as 3ds max, Realflow, Rayfire, and GIS are integrated to build a final dam failure flood risk early warning platform. After the 3ds max software combines Rayfire and other plug-in platforms to complete the 3D real terrain model and the damage model of the dam building, the entire model is imported into the Realflow software for the actual data of the dam failure and the evolution of the flood to generate the final animation of the flood evolution. In the later stage, NUKE, Pr and other tools were used to beautify the animation demonstration process, making the demonstration process intuitive. Specifically follow the steps below:
[0049] Ste...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com