A technology of power outage management system and production management system, applied in the direction of information technology support system, data processing application, instrument, etc., can solve the overall arrangement of reducing power grid operation efficiency, increasing distribution network safety hazards, and affecting power distribution equipment power outage plan and implementation issues

Inactive Publication Date: 2020-01-17
XINXIANG POWER SUPPLY COMPANY STATE GRID HENAN ELECTRIC POWER +1
View PDF3 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

However, due to the tight schedule and heavy tasks of the distribution network project, insufficient pre-preparation work, inadequate management of equipment defects, strong randomness in user equipment maintenance and user power access, and other factors, frequent changes and cancellations of power outage plans , which in turn affects the overall arrangement and execution of the power distribution equipment outage plan, resulting in the failure of timely and effective maintenance and scheduling of the power distribution equipment, reducing the efficiency of the power grid operation, and increasing the safety hazards in the operation of the distribution network

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Power distribution network power failure management system
  • Power distribution network power failure management system

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0031] The technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only a part of the embodiments of the present invention, rather than all the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those of ordinary skill in the art without creative work shall fall within the protection scope of the present invention.

[0032] Due to the tight schedule and heavy tasks of the distribution network project, insufficient preliminary preparations, inadequate equipment defect management, and strong influences such as user equipment maintenance and user power access, etc., there are often changes and cancellations of power outage plans. This has affected the overall arrangement and implementation of the power outage plan for power distribution equipment, result...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses a power distribution network power failure management system, which is applied to an OMS system, and comprises an information layer comprising a power utilization and acquisition system, a production management system and a power distribution network automation system; an analysis layer which comprises a safety conflict check unit, a dual-power conflict check unit, an accompanying stop analysis unit, a repeated power failure check unit and a reliability check unit; an integration layer which comprises a power failure plan updating unit for increasing or modifying powerfailure information of the power failure plans and a power failure plan integration unit for integrating all the power failure plans according to whether the power failure ranges are overlapped; and the execution layer comprises a scheduling unit for scheduling all the power failure plans and a scheduling control center for executing the power failure plans according to a scheduling result of thescheduling unit. Parameter information related to power grid safety power failure factors is obtained through the analysis layer, then power failure information is added or modified for the power failure plan, it is guaranteed that the power failure plan is executed timely and reliably, and the probability of potential safety hazards in operation and power failure of the power distribution networkis reduced.

Description

Technical field [0001] The invention relates to the field of power distribution network operation, in particular to a power outage management system of the power distribution network. Background technique [0002] At present, the large number of distribution network equipment, the direct connection of the distribution network to users, and the very close cooperation between the grid and urban construction determine that the power outage plan of the distribution network equipment is more complicated. At the same time, because the power outage plan of power distribution equipment involves multiple departments and units such as dispatching, production, and equipment operation units, it makes it difficult to coordinate and manage power outage plans for power distribution equipment. [0003] In recent years, due to the continuous increase in power investment and the large number of distribution network projects, more power outage plans have been arranged accordingly. However, due to th...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
IPC IPC(8): G06Q10/06G06Q50/06
CPCG06Q10/06315G06Q50/06Y04S10/50
Inventor 余开济杨璞王新铭刘沛铮王正昊刘智昱李思洋刘瑞云崔雪宁张丽高建军庞飞
Owner XINXIANG POWER SUPPLY COMPANY STATE GRID HENAN ELECTRIC POWER
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products