Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

Guiding device for supporting construction of foundation pit in narrow zone and construction method

A foundation pit support and construction diversion technology, which is applied in the direction of foundation structure engineering, excavation, sheet pile walls, etc., can solve the problems of large construction space restrictions, slow hole forming speed, and delayed construction period, so as to reduce curves Sedimentation, reduced head loss, and high construction quality

Pending Publication Date: 2020-01-17
ANHUI SHUIAN CONSTR GRP CO LTD
View PDF0 Cites 4 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0002] At present, the deep foundation pit support of urban rainwater and sewage tank culvert renovation projects has the following defects in the support structure and construction diversion method adopted for the side wall of the foundation pit and the surrounding environment: 1. The single cement-soil enclosure wall lacks bearing capacity , large stress deformation; 2. The soil extrusion process of reinforced concrete sheet piles is more serious, the cost is high, the construction is inflexible, and the space is limited; 3. Bored piles are not suitable for small foundation pits and their quality is relatively low. Difficult to control, labor-intensive and time-consuming, and the speed of hole formation is slow; 4. Traditional foundation pit support only has support bearing capacity and no construction diversion capacity
[0004] However, the above-mentioned deep foundation pit support construction technology is often limited by the space due to the inflexibility of the construction, the concrete quality is difficult to control, it is labor-intensive and time-consuming, and the hole forming speed is slow, resulting in a delay in the construction period.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Guiding device for supporting construction of foundation pit in narrow zone and construction method
  • Guiding device for supporting construction of foundation pit in narrow zone and construction method
  • Guiding device for supporting construction of foundation pit in narrow zone and construction method

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0031] In order to make the purposes, technical solutions and advantages of the embodiments of the present invention clearer, the technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the embodiments of the present invention. Obviously, the described embodiments are part of the present invention. examples, but not all examples. Based on the embodiments of the present invention, all other embodiments obtained by those of ordinary skill in the art without creative efforts shall fall within the protection scope of the present invention.

[0032] Please refer to Figure 1 to Figure 3 , the structure of the diversion device for foundation pit support construction in a narrow area in this embodiment is set as follows:

[0033] The foundation pit of the interception well 1 is supported by Larsen steel sheet piles 11 and H-shaped steel internal support to form the foundation pit support structure, and the or...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention provides a guiding device for supporting construction of a foundation pit in a narrow zone and a construction method. The structure is as the follows that an original box culvert is cutinto two sections of a front section and a rear section by an intercepting well; an inner circle and an outer circle of high-pressure jet grouting piles are constructed at the periphery of an intercepting well foundation pit; H-shaped steels are interpolated in modes of closely inserting and inserting one by one with one interval; the outer circle of high-pressure jet grouting pile is arc-shaped,and the positions, the right above the front section and the rear section of the original box culvert, of two ends of the outer circle of high-pressure jet grouting pile are connected with the inner circle of high-pressure jet grouting pile through full reinforcement of the high-pressure jet grouting pile; a reinforced concrete inner support is arranged between the inner circle and the outer circle of high-pressure jet grouting piles, and a guide groove foundation pit is excavated between piles; and the front and rear sections of the original box culvert are respectively provided with holes inthe side wall and the holes communicate with the guide grooves; and the front section and the rear section of the original box culvert respectively use the positions corresponding to the right lowerparts of the H-shaped steels inserted into the inner circle of high-pressure jet grouting pile as a plugging part, a temporary plugging wall is formed between the underwater concrete and the intercepting well, and bidirectional steel bars are configured in the wall. The device meets the requirement of foundation pit supporting and simultaneously has construction diversion capability.

Description

technical field [0001] The invention relates to a deep foundation pit support structure and a construction method, in particular to a diversion device and a construction method for foundation pit support construction in a narrow area. Background technique [0002] At present, the deep foundation pit support of urban rainwater and sewage tank culvert renovation projects has the following defects in the support structure and construction diversion method adopted for the side wall of the foundation pit and the surrounding environment: 1. The single cement-soil enclosure wall lacks bearing capacity , large stress deformation; 2. The soil extrusion process of reinforced concrete sheet piles is more serious, the cost is high, the construction is inflexible, and the space is limited; 3. Bored piles are not suitable for small foundation pits and their quality is relatively low. Difficult to control, labor-intensive and time-consuming, and the hole forming speed is slow; 4. The tradi...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): E02D17/04E02D5/04E02D5/08E02D5/46E02D19/18
CPCE02D17/04E02D5/04E02D5/08E02D5/46E02D19/18
Inventor 魏邦仁赵德平杨毅龚华董建民夏伦学薛仰轶陈晨伟靳艳岳焦钘宇
Owner ANHUI SHUIAN CONSTR GRP CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products