A system and method for train operation safety protection based on dynamic resource management
A technology with dynamic resources and safe operation, applied in the field of rail transit, it can solve the problems of insufficient and reasonable utilization of line resources, inability to directly obtain train information by on-board equipment, and restrict the utilization of resources for operational flexibility, so as to improve the return interval. and operational efficiency, achieve interconnection and interoperability, and achieve the effect of direct real-time transmission
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0032] Based on the dynamic resource management train operation safety protection system and method, the safety path protection of train operation no longer depends on the fixed route from signal machine to signal machine.
[0033] Train operation safety protection system based on dynamic resource management, including:
[0034] Object controller OC equipment: installed on the trackside, used for line resource recording, trackside basic signal equipment driving and mining control, and providing safety protection when the train is degraded;
[0035] Vehicle-mounted OBC equipment: Provide complete CBTC security protection functions. The vehicle-mounted OBC applies to the object controller OC for moving route locking in real time according to the train operation plan. The object controller OC controls basic signal equipment such as trackside switches and signal machines to provide train operation Reserve a safe path, dynamically obtain the usage of line resources from the object ...
Embodiment 2
[0038] combine figure 1 As shown, the entire protection process of the train operation safety protection method based on dynamic resource management is described as follows:
[0039] In order to better illustrate this inventive method, the following explanations of terms are first agreed:
[0040] Resources: Line usage rights required for train operation;
[0041] Reserved: that is, locked. If the resource is reserved, the direction cannot be changed. If the turnout is reserved, the turnout cannot be operated;
[0042] Unreserve: release of locked resources;
[0043] Step 1: Assuming that there are two vehicles on the line, the front vehicle and the rear vehicle, and the P1-P3 turnout is positioned, the front vehicle determines that its driving intention is to run from the current position to S04 according to its own train operation plan; the rear vehicle determines according to its own train operation plan. The operation plan determines that its driving intention is to run...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com