Pontoon bridge capable of being quickly assembled and assembling method thereof
A pontoon bridge and fast technology, which is applied in the field of pontoon bridges and their assembly, can solve the problems of pontoon bridge safety accidents, complicated erection process, and structural damage at the joints, and achieve safety hazards, simple operation, and good cushioning performance Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0055] refer to figure 1 As shown, the present invention discloses a pontoon bridge that can be quickly assembled, comprising a bridge head unit 100, a bridge tail unit 200, several intermediate units 300 connected between the bridge head unit 100 and the bridge tail unit 200, and several installation The transition plate 400 between the gaps of the adjacent intermediate units 300 .
[0056] Cooperate Figure 1 to Figure 3 , Figure 8 As shown, the intermediate unit 300 includes a first bridge body 1, a second bridge body 2, a third bridge body 3, a first connecting plate 4 and a second connecting plate 5, and the first bridge body 1 and the second bridge body 2 are respectively connected On both sides of the third bridge body 3 , the bottoms of the first bridge body 1 and the second bridge body 2 are respectively provided with a first groove body 11 and a second groove body 21 . The first connecting plate 4 is arranged on the first bridge body 1, and the left end of the fi...
Embodiment 2
[0066] Cooperate Figure 10 and Figure 11 As shown, the present invention also discloses a method for assembling the pontoon bridge, which is used to assemble the pontoon bridge in Embodiment 1, comprising the following steps:
[0067] S1. Position the bridge head, fix the bridge head unit on the side of the river bank, and connect the first intermediate unit on the side of the bridge head unit, and make the side of the first intermediate unit with the first connecting plate face outward ;
[0068] S2, assembling the middle bridge section, it comprises the following steps:
[0069] S21, towing, using a towing boat to tow and launch multiple intermediate units, and make the second connecting plates of each intermediate unit face to the side of the bridge head unit;
[0070] S22. Assembling, use two towing boats to support the first intermediate unit from both sides, so that the position of the first intermediate unit is fixed, and then use another towing boat to move the se...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com