Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

Fabricated overhead ground installation system and method of ceramic tile concrete composite board

A technology of installation system and installation method, which is applied to floors, local raised floors, covering/lining, etc., can solve problems such as high cost, increased labor wages, and broken tiles during use, and achieve flatness and verticality. Precise, fast and efficient installation

Pending Publication Date: 2019-09-17
GOLD MANTIS FINE DECORATION TECH SUZHOU CO LTD
View PDF0 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] In the construction of the existing building decoration tile floor, it is necessary to mix the cement mortar on site to level it with a diameter of about 4cm and to build a water and electricity pipeline with a diameter of about 2.5cm. , the number of skilled tile-laying workers is decreasing year by year, labor wages are increasing year by year, and the technical level is uneven; moreover, the tile laying produces empty drums or is broken during use, and there is a lot of construction waste in the maintenance process, which is costly and long-term

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Fabricated overhead ground installation system and method of ceramic tile concrete composite board
  • Fabricated overhead ground installation system and method of ceramic tile concrete composite board
  • Fabricated overhead ground installation system and method of ceramic tile concrete composite board

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0031] see Figure 1 to Figure 5 , the figure shows a prefabricated overhead ground installation system for a tiled concrete composite board provided by Embodiment 1 of the present invention, which includes a tiled concrete composite board 3, and a plurality of pipe clips 31 are fixedly connected to the back of the tiled concrete composite board, and the pipe clips 31 are Arc-shaped opening pipe clip, there is a cavity for laying water and electricity pipelines between the tiled concrete composite board 3 and the ground base 2: the system also includes a composite board connection mechanism, which includes a horizontal metal pipe body 11 and a pipe code 12, and the pipe clip 31 will The tile-concrete composite board 3 is connected to a horizontal metal pipe body 11, which is a round pipe;

[0032] Among them, see Figure 1 to Figure 2 and Figure 5 Specifically, the horizontal metal pipe body 11 is a round pipe, and the pipe clamp 31 is an arc-shaped clamping plate, which ca...

Embodiment 2

[0042] see Figure 1 to Figure 2 , the figure shows a prefabricated overhead ground installation system for tile-concrete composite panels provided by Embodiment 2 of the present invention. On the basis of the above-mentioned embodiments, this embodiment further makes the following technical solutions as improvements : the back side of the cardboard is provided with a plurality of ribs 311 extending along the width direction of the cardboard. When the cardboard is an arc-shaped cardboard, the ribs are arc-shaped ribs. Form the strengthening effect of the clamping plate to prevent the deformation of the clamping plate and affect the firmness of the clamping connection; on the other hand, when removing the floor veneer, use the ribs on the back to make one end of the clamping plate in the length direction first detach When the metal pipe body is horizontal, the ribs can prevent the one end from being broken when it is pulled up, so that the ground veneer can be easily removed wh...

Embodiment 3

[0044] see Figure 1 to Figure 2 , the figure shows a prefabricated overhead ground installation system for ceramic tile concrete composite panels provided by Embodiment 3 of the present invention. This embodiment further makes the following improvements on the basis of the above-mentioned embodiments Technical solution: the thickness of the tiled concrete composite board 3 is 15-25mm, and the height of the cavity between the tiled concrete composite board 3 and the ground base 2 is 15-25mm, which can not only ensure the strength of the composite board, but also ensure the bottom of the composite board Sufficient space for piping installation.

[0045] The prefabricated overhead ground installation system of a tile-concrete composite panel described in the above embodiment is mainly realized by the following construction methods:

[0046] 1. Through the aluminum alloy pipe code 12 (16mm in height) through the galvanized horizontal metal pipe body 11 (diameter 20mm, set 6 pipe...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

PropertyMeasurementUnit
Thicknessaaaaaaaaaa
Heightaaaaaaaaaa
Thicknessaaaaaaaaaa
Login to View More

Abstract

The invention provides a fabricated overhead ground installation system of a ceramic tile concrete composite board. The fabricated overhead ground installation system of the ceramic tile concrete composite board comprises the ceramic tile concrete composite board and a composite board connection mechanism, a plurality of pipe clamps are fixedly connected to the back surface of the ceramic tile concrete composite board; and the composite board connection mechanism comprises a horizontal metal pipe body and pipe codes, the ceramic tile concrete composite board is connected to the horizontal metal pipe body through the pipe clamps, the horizontal metal pipe body is a circular pipe, and the horizontal metal pipe body is fixed to the ground base layer by adopting the pipe codes. The invention further provides a fabricated overhead ground installation method of the ceramic tile concrete composite board. Compared with the prior art, fabricated decoration product industrial production and rapid and efficient installation by an assembler can be realized, products are applied to the condition of smaller house internal space, production of building waste is greatly reduced in the decoration engineering process, the maintenance is convenient, the ceramic tile concrete composite board can be detachable and repeatedly used for installation, and finally, the purpose of reducing the comprehensive construction cost is realized.

Description

technical field [0001] The invention relates to a ground installation technology of a tile-concrete composite board, in particular to an assembly type overhead ground installation system and method for a tile-concrete composite board. Background technique [0002] Prefabricated decoration is a new form of decoration construction in recent years. As the name implies, prefabricated decoration is to complete the production of various parts and components required for decoration in the factory, and then transport them to the decoration site for assembly and installation, eliminating the need for traditional decoration on-site measurement and cutting of various parts and components. The construction is simpler and more convenient, which can greatly improve the construction efficiency of the decoration site, and the construction site is more tidy and beautiful, and will not produce too much decoration material waste. It is a more green and environmentally friendly form of decorati...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): E04F15/024
CPCE04F15/024E04F15/02405E04F15/02447E04F2290/02
Inventor 钱炜
Owner GOLD MANTIS FINE DECORATION TECH SUZHOU CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products