Biological purification retention zone for multifunctional sponge city municipal road and construction technology of biological purification retention zone
A multi-functional sponge and municipal road technology, which is applied in the field of biological purification retention belt and its construction technology for multi-functional sponge city municipal roads, can solve the problems of polluting the road surface and increasing the pressure of the drainage system, etc.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0053] A kind of multi-functional sponge city municipal road biological purification retention belt, such as figure 1 As shown, it includes: a waterproof geotextile layer 100 laid on the inner wall of the municipal road divider; a water storage and drainage layer 200, an aquifer 300, a water-permeable layer 400, a filter layer 500, and a planting layer 600 laid sequentially from bottom to top; the planting layer The upper surface of 600 is in a concave arc shape; the permeable pipe 700 pierced in the water storage and drainage layer 200 ; and the drainage system 800 is arranged in the middle of the planting layer 600 .
[0054] Specifically, the waterproof geotextile layer 100 is formed by covering the entire road divider with waterproof geotextiles. The waterproof geotextiles are stacked on each other during laying, and the seams overlap at least 15cm. The adjacent waterproof geotextiles are stitched or bonded. The form is fixed to ensure the waterproofness of the seams.
[...
Embodiment 2
[0067] A construction process of a biological purification retention zone, the process comprises the following steps:
[0068] Step 1: Determine the width of the biological purification retention zone according to the width of the middle zone and side zone in the design of the municipal road, and excavate the foundation pit. The excavation of the foundation pit adopts the method of artificial step excavation.
[0069] Step 2: Lay waterproof geotextiles along the inner wall of the foundation pit and completely cover the foundation pit to form a waterproof geotextile layer 100. The waterproof geotextiles are stacked on each other during laying, and the seams overlap at least 15cm. Adjacent waterproof geotextiles The seams are fixed by stitching or bonding to ensure the waterproofness of the seams.
[0070] Step 3: lay a permeable pipe 700 at the middle of the bottom of the foundation pit along the extension direction of the municipal road. The permeable pipe 700 adopts a soft pe...
PUM
Property | Measurement | Unit |
---|---|---|
Diameter | aaaaa | aaaaa |
Diameter | aaaaa | aaaaa |
Thickness | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com