Excavation method of bedding slope crack toe plate protection layer of karst landform

A protective layer and karst technology, applied in the field of water conservancy and hydropower building construction, can solve the problems of long construction period, unsatisfactory quality, and large engineering volume, and achieve the effects of saving costs, improving mechanical utilization, and improving construction progress

Active Publication Date: 2019-07-09
SINOHYDRO BUREAU 12 CO LTD
View PDF5 Cites 4 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

The disadvantage of the first method is that it is only suitable for dam foundations with relatively complete bedrock and good geological conditions, and is not suitable for dam foundations with thin layers of joints, cracks, and faults in karst landforms.
The disadvantages of the second method are: large amount of repeated foundation clearing works, long construction period, high cost, and unsatisfactory quality

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Excavation method of bedding slope crack toe plate protection layer of karst landform
  • Excavation method of bedding slope crack toe plate protection layer of karst landform
  • Excavation method of bedding slope crack toe plate protection layer of karst landform

Examples

Experimental program
Comparison scheme
Effect test

specific Embodiment

[0072] Specific embodiment: application of blasting construction of flexible cushion with reserved protective layer

[0073] In view of the relatively poor geological conditions of the foundation surface of the plinth of the interlayer dam, the lithology and geological conditions vary greatly, and most of them are bedding slopes, the rocks are weathered, and the joints, fissures, and faults are developed and complex. The size and flatness of the excavation have high requirements. After multiple verifications and considering the convenience and economy of construction, the blasting construction technology of the reserved protective layer flexible cushion was selected.

[0074] The blasting construction process of the flexible cushion layer reserved for the protective layer on the foundation surface of the toe slab of the Jiayan Dam is specifically to determine the blasting construction parameters through the blasting test before the blasting excavation: hydraulic drilling rigs a...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention relates to an excavation method of a bedding slope crack toe plate protection layer of karst landform. The excavation method is characterized by adopting simultaneous blasting of toe plate foundation surface bench blasting and upstream slope double-energy-gathering pre-splitting smooth surface blasting and combining a flexible cushion layer and a bench millisecond differential blasting method with a reserved protection layer; and the excavation method specifically comprises the following steps that technical disclosure is conducted; survey and setting out are conducted; blast hole positions are determined; a drill rig is in place; the drill rig starts drilling, and a hole drilling record is filled; when a blast hole is drilled to be about 40 cm, recheck is conducted, and thehole drilling angle is adjusted; the blast hole depth is controlled, and the 30-50 cm of protecting layer is reserved; as for the special geological conditions, related records are well made, and whether blasting design is adjusted or not is considered; blasting construction is conducted; according to the blasting design, the blast hole is filled with the flexible cushion layer, explosive is charged, the hole is plugged, explosive in the hole is networked, and blasting is conducted; and the protection layer is excavated. According to the excavation method of the bedding slope crack toe plate protection layer of the karst landform, the cost is saved, the mechanical utilization rate is increased, the construction progress is accelerated, and the favorable conditions are created for subsequent construction.

Description

technical field [0001] The invention belongs to the field of water conservancy and hydropower building construction, and relates to an excavation method for a dam toe slab of a concrete face rockfill dam, in particular to an excavation method for a along-slope fissure toe slab protective layer and an upstream side slope in karst landform. Background technique [0002] The research and test of one-time explosive removal method of bedrock protective layer has only a history of more than 20 years in our country. Its development is quite slow. From the perspective of fast and efficient construction, it is not yet mature, and it is still in the stage of continuous exploration and improvement. Therefore, it has not been widely used in the excavation construction of rock foundations of hydraulic structures. [0003] In the early 1950s, N.V. Melnikov, an academician of the former Soviet Academy of Sciences, made a pioneering research on "spaced charge blasting". At the same time, S...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): F42D1/00F42D3/04
CPCF42D1/00F42D3/04
Inventor 劳俭翁陈亚坤王宏伟方浩盘小平沈益源方飞来沈仲涛马现军
Owner SINOHYDRO BUREAU 12 CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products