Integral support system and construction method of rock pillar in double-hole tunnel

A holistic, tunnel-based technology, applied in tunnels, tunnel linings, earthwork drilling and mining, etc., can solve problems such as the lack of a unified theory of rock pillar reinforcement technology, troubles in the construction of double-hole tunnels, and large spans in single-hole tunnels. Improve the support system, reduce vertical and horizontal displacement, and save economic costs

Inactive Publication Date: 2019-05-31
NORTHEASTERN UNIV
View PDF5 Cites 1 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

Due to the large span and poor stability of single-hole tunnels, it has brought great difficulties to the construction. Therefore, more and more double-hole tunnels are used at present. There are two structural forms of double-hole tunnels and small clear distance tunnels. The stability mainly depends on the stability of the middle rock pillar, but the poor stability and easy cracking of the middle rock pillar are the main problems that plague the construction of double tunnel tunnels
The middle rock column reinforcement technology mainly adopts three reinforcement technologies: small conduit grouting, system bolt, and horizontal through prestressed bolt. The above three are widely accepted, and two or three anchoring methods are generally used in engineering In combination, there are large differences in the surrounding rock support methods even at the same level, which shows that there is no unified theory for medium rock pillar reinforcement technology

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Integral support system and construction method of rock pillar in double-hole tunnel
  • Integral support system and construction method of rock pillar in double-hole tunnel
  • Integral support system and construction method of rock pillar in double-hole tunnel

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0032] It should be noted that all directional indications (such as up, down, left, right, front, back...) in the embodiments of the present invention are only used to explain the relationship between the components in a certain posture (as shown in the accompanying drawings). Relative positional relationship, movement conditions, etc., if the specific posture changes, the directional indication will also change accordingly.

[0033] Such as Figures 1 to 4 As shown, the present invention provides an integral support system for rock pillars in a double-hole tunnel, including some upper grouting anchors 5, some horizontal prestressed grouting anchors 6, some lower grouting anchors 7, several The hoop steel belt 2 and several longitudinal steel belts 3, in this embodiment, the rock pillar 1 in the tunnel is divided into the upper part, the middle part, and the lower part, and the upper left and right sides of the rock pillar 1 in the tunnel are anchored with upper grouting bolts...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

Provided are an integral support system and a construction method of a rock pillar in a double-hole tunnel. Upper grouting bolts are anchored on left and right sides of the upper portion of the rock pillar in the tunnel, a horizontal pre-stress grouting bolt is horizontally anchored and penetrates through the middle of the rock pillar in the middle of the tunnel, lower grouting bolts are anchoredon the left and right sides of the lower portion of the rock pillar in the tunnel, the anchor heads of each bolt have appropriate exposed lengths, a plurality of mounting holes adapted to each bolt exposed end are formed in circumferential steel strips and longitudinal steel strips, a plurality of the circumferential steel strips are circumferentially arranged along the inner wall of the tunnel, the mounting holes on the circumferential steel strips respectively tightly sleeve the exposed ends of the corresponding upper grouting bolt, the horizontal pre-stress grouting bolt or the lower grouting bolt, a plurality of the longitudinal steel strips are arranged in the axial direction of the tunnel, the mounting holes of the longitudinal steel strips respectively tightly sleeve with the exposed ends of the corresponding bolts, and the exposed ends of the bolts are screwed with locking nuts. The construction method has simple construction process, is easy to operate, and especially has a significant effect on the support of a broken rock body.

Description

technical field [0001] The invention belongs to the technical field of geotechnical engineering, and in particular relates to an integral support system and construction method for rock pillars in a double-hole tunnel. Background technique [0002] With the rapid development of my country's economy, the state has increased investment in road construction, and high-grade roads have gradually extended from plain areas to mountainous areas in the central and western regions. Due to the large span and poor stability of single-hole tunnels, it has brought great difficulties to the construction. Therefore, more and more double-hole tunnels are used at present. There are two structural forms of double-hole tunnels and small clear distance tunnels. The stability mainly depends on the stability of the middle rock pillar, but the poor stability and easy cracking of the middle rock pillar are the main problems that plague the construction of double-hole tunnels. The middle rock column...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): E21D11/00E21D11/10E21D20/02
Inventor 王述红孙健王彪张雨浓朱宝强董福瑞
Owner NORTHEASTERN UNIV
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products